FIG.G
FIG.H
Ground
17-049
www.powercommander.com
9
Plug the pair of matching PCV leads in-line with the stock TPS connectors
(Fig. G).
10 Secure the ground wire of the PCV with the small ring lug to the negative (-)
terminal of the bike's battery (Fig. H).
11 Lower and bolt down the front of the fuel tank.
12 Reassemble the tail section; and reinstall the seats.
2005-2006 Kawasaki ZX-6R & ZX-6RR - PCV - 5
Need help?
Do you have a question about the POWER COMMANDER V and is the answer not in the manual?
Questions and answers