Optional) Installing Top Frames (Top Pipe Routing) - Huawei FusionModule2000 Installation Manual

Smart modular data center
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide
Figure 7-13 Securing an enclosure frame
Step 5 Install the mounting kits removed in
frame.
Step 6 Install the front door on the enclosure frame.
Step 7 Install the LCD power cable, and connect the ground cable under the front door to the ground
point marked on the enclosure frame.
Step 8 Cut the cable ties securing the LCD power cable to the cabinet, and stretch the power cable to
ensure that the door can be opened and closed smoothly.
----End

7.2.2 (Optional) Installing Top Frames (Top Pipe Routing)

Preparations
Tool: Phillips screwdriver
Issue 02 (2018-03-31)
Align the upper and lower holes before tightening screws.
The enclosure frame side with anchor bolts should face the cabinet bottom.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Step 3
at the corresponding positions on the enclosure