Page 3
VNT-TCBRK ......................................54 VXT-BL515 ....................................... 55 GMT-FLG ......................................56 GMI-BNFIX ....................................57 GMI-IPCOV ....................................58 VNI-WS15...................................... 59 GMT-6CASE ....................................60 GEO M6 SERIES MODULES & ACCESSORIES LIST ..................61 10 USER NOTES ................................63 Page 3 / 64 System Manual GEOM6...
Page 4
“Tried and true” methods will produce entirely unexpected results. HRW technology produces precise and predictable results. The Configurable Directivity Flange. A waveguide that allows the operator to alter its behaviour. An unprecedented NEXO development that is easy to use – once you know how and when.
User Manual. Failure to do this exposes people to potential injury or death. Please check the web site nexo-sa.com for the latest update. Always consult qualified NEXO personnel if the device installation requires construction work and make sure to observe the following precautions: Mounting precautions choose mounting hardware and an installation location that can support 4 times the weight of the speaker system;...
Page 6
PLEASE READ CAREFULLY BEFORE PROCEEDING HIGH SOUND PRESSURE LEVELS Exposure to extremely high noise levels may cause permanent hearing loss. Individuals vary considerably in susceptibility to noise-induced hearing loss but nearly everyone will lose some hearing if exposed to sufficiently intense noise for a sufficient period of time. The U.S. Government’s Occupational and Health Administration (OSHA) has specified the following permissible noise level exposures: Sound Duration Per Day In Hours Sound Level dBA, Slow Response...
INTRODUCTION NTRODUCTION Thank you for selecting a NEXO GEO M6 Series Tangent Array System. This manual is intended to provide you with necessary and useful information about your GEO M6 System, which includes the following products: • GEO M620 is a 20° Tangent Array Module. It comprises 1x6.5” (17cm) 8 ohms LF/MF driver and 1x1.5”...
GEO M6 GENERAL SET-UP INSTRUCTIONS GEO M6 G ENERAL NSTRUCTIONS GEO M620 and GEO M6B connections GEO M620 and GEO M6B are connected with Speakon NL4FC plugs (not supplied). A wiring diagram is printed on the connection panel located on the back of each cabinet. The 4 pins of the Speakon sockets identified in / out are connected in parallel within the enclosure.
GEO M6 GENERAL SET-UP INSTRUCTIONS Cabling NEXO recommends the exclusive use of multi-conductor cables to connect the system: the cable kit is compatible with all the cabinets, and there is no possible confusion between LF, MF and HF sections. Cable choice consists mainly of selecting cables of the correct sectional dimension (size) in relation to the load resistance and the cable length.
In addition, it provides mechanical information for all clusters in agreement with Structural Analysis Reports (available in the Help section): dimensions, weight, gravity centre position, forces, moments, working load and safety factor. NS-1 installation package includes all NEXO User Manuals, Structural Analysis Reports and Certificates PDF files. NS-1 is a freeware available on nexo-sa.com...
Remove the 2 TORX screws per flange on each side of the GEO Waveguide (drawings below); Install or remove the 120° flanges with the 2 TORX screws Re-install the grid, being careful that the NEXO logo must be on the woofer side. When & where to use Configurable Directivity flanges The diagrams show audience area coverage for a stereo system.
Safety first GEO M6 Rigging System structural computations and related documents are available in NS-1 or at NEXO (info@nexo.fr) upon request. We include this section to remind you of safe practice when flying the GEO M6 system. Please read it carefully. However, user must always apply his or her knowledge, experience and common sense.
For fixed installations, wind loading has to be taken into account in accordance to the national standards. The GEO M6 Rigging System requires regular inspection and testing by a competent test centre. NEXO recommend that the system is load tested and certified annually or more frequently if local regulations require.
- “Right” means HF waveguide is right as seen from front. GEO M6 can be connected to bumpers “Left” or “Right” by simply flipping the cabinets. Whenever possible, NEXO recommends symmetrical designs (preferably NEXO logo outwards and HF waveguide inwards in stereo configurations) GEO M620 “Left”...
GEO M6 HARDWARE SETUP PROCEDURE In order to avoid misuse or wrong angle setting by confusing left and right printings on GEO M6, remember that: The cabinet articulation hole around which angle setting bar rotates is always the one with no angle value indication The cabinet angle setting hole along which angle setting bar slides is always next to the “0°”...
All GEO M6 accessories are specifically rated in agreement with structural computations. Never use other accessories – including push-pins - when assembling GEO M6 cabinets than the ones provided by NEXO: NEXO will decline responsibility over the entire GEO M6 accessory range if any component is purchased from different supplier.
In order to prevent screws from getting loose in fixed installations, use blocking liquid LOCTITE 243 or equivalent for all screws used with GEO M6 fixed installation accessories. LOCTITE 243 is available at NEXO or at your local distributor upon request. Page 25 / 64 System Manual GEOM6...
GEO M6 HARDWARE SETUP PROCEDURE 1 to 3 (maximum) GEO M6 wall mounted Required items 1 x VNI-WS15 1 x GMT-LBUMP 1 to 3 GMI-BNFIX 3 x 12mm diameter screws (not provided) IMPORTANT Ensure that the wall is strong enough to hold 4 times GEO M6 cluster weight and that the 12 mm diameter screws and corresponding plugs required to fix the VNI-WS15 on the wall are properly dimensioned.
GEO M6 HARDWARE SETUP PROCEDURE 1 to 3 (maximum) GEO M6 ceiling mounted Required items 1 x GMT-LBUMP 1 to 3 x GMI-BNFIX 4 x 8mm diameter screws (not provided) IMPORTANT Ensure that the ceiling is strong enough to hold 4 times GEO M6 cluster weight and that the four screws 8 mm diameter and corresponding plugs required to fix the GMT-LBUMP under the ceiling are properly dimensioned.
GEO M6 HARDWARE SETUP PROCEDURE 4 to 12 (maximum) GEO M6 ceiling mounted Required items 1 x GMT-BUMPER 4 to 12 x GMI-BNFIX 4 x 8mm diameter screws (not provided) IMPORTANT Ensure that the ceiling is strong enough to hold 4 times GEO M6 cluster weight and that the four screws 8 mm diameter and corresponding plugs required to fix the bumper under the ceiling are properly dimensioned.
IMPORTANT (NEXO SUB POLE STAND) - NEXO VXT-PLSTD pole stand only should be used for mounting on top of NEXO SUB - NEXO SUB must always be installed on a horizontal surface; - Ensure that public is not allowed within a safety area which radius is equal or higher than assembly height.
Page 31
GEO M6 HARDWARE SETUP PROCEDURE Procedure Attach the GMT-LBPADPT to the GMT-LBUMP by using the screws, washers and bolts provided with GMT-LBPDAPT; Use the 2 pins provided with VNT-POLE to attach L-BUMP at required vertical angle, according to below drawings; Bottom GEO M6 at 0°...
GEO M6 HARDWARE SETUP PROCEDURE 1 to 3 GEO (maximum) M6 truss or cable mounted Required items 1 x GMT-LBUMP 1 x GMT-LBPADPT 1 x VNT-TCBRK (truss mounting) or 1 x VNT-XHBRK (cable mounting) 3 x VXT-BL515 for first GEO M6 4 x VXT-BL515 for second and third GEO M6 IMPORTANT Ensure that suspension point is strong enough to hold 4 times GEO M6 cluster weight (35 kg)
GEO M6 HARDWARE SETUP PROCEDURE 1 to 6 (maximum) GEO M6 stacked on Sub Required items 1 x GMT-BUMPER 1 x GMT-BPADPT-2 4 VXT-BL515 per GEO M6 IMPORTANT GMT-BPADPT is rated for a maximum of 6 x GEO M6 on a single LS18 in any inter cabinet angle configuration, provided the stack is assembled according to below rules: - LS18 must always be installed on a horizontal surface;...
GEO M6 HARDWARE SETUP PROCEDURE 4 to 12 (maximum) GEO M6 flown Required items 1 or 2 hoists (not provided). 1 x GMT-BUMPER 1 x GMT-EXBAR for extended positive and negative bumper angles 4 VXT-BL515 per GEO M6 1 x GMT-6CASE for 6 x GEO M6 IMPORTANT Maximum GEO M6 quantity for flown vertical cluster is 12 (and eventually less).
Page 35
GEO M6 HARDWARE SETUP PROCEDURE lift assembly to sufficient height in order to connect additional set GEO M6 if required set inter-angle values IMPORTANT Ensure all pins are properly locked into Geo M6 lift cluster to NS-1 defined rigging height, secure cluster horizontally to prevent it from rotating Secure bumper with secondary safety steel.
Page 36
GEO M6 HARDWARE SETUP PROCEDURE Procedure with flight case set horizontally Open upper cover while the flight case is on its wheels Connect GMT-BUMPER to top cabinet 4 x VXT-BL515 quick release pins If required, connect GMT-EXBAR to GMT-BUMPER by inserting EXBAR clevis pins into GMT-BUMPER “B” and “D” holes Connect single hoist to required hole as indicated in NS1 design “A”, “B”, “C”, “D”...
After cleaning, the rigging system must be treated with a suitable lubricant to prevent rusting. NEXO recommends the use of Scottoil FS365 which is a water-based lubricant with a mixture of machine oil, surfactant and anti-rust treatment.
Cluster design must be done with NS-1, which provides very intuitive and fast method to determine all cluster geometry parameters in relation to venue where cluster is implemented. NS-1 is a freeware available for all NEXO users at nexo-sa.com IMPORTANT Never install a GEO M6 cluster without checking its acoustical performances and mechanical safety in NS- 1 prior to installation.
Angle (in radians)=3.142 x Angle (in degrees)/180 Computer – Laptop or Desktop PC running Windows XP with the current version of NEXO NS-1 installed. It is not possible to configure a Geo tangent array properly without using NS-1. Note that, when NS-1 designs are prepared prior to arrival at the venue, it is often necessary to modify or update the design to accommodate special circumstances.
SYSTEM CHECK ALIGNMENT GUIDELINES GEO M6 – LS18 System check list It is essential to execute all these check steps prior to perform a sound check on the “front end” to the system. Following this checklist step by step will prevent many troubles and will save time in the end. Are the speakers properly connected and angled? Attach the first series of modules to the bumper.
TECHNICAL SPECIFICATIONS ECHNICAL PECIFICATIONS LS18 and LS18-E Subwoofers System specifications LS18 WITH NEXO TDCONTROLLER SETUP Frequency Response @-6 dB 32Hz - 130 Hz Sensitivity 1W@1m 107 dB SPL Nominal Peak SPL@1m 137 to 140 dB Available Crossover Frequencies 35-60, 35-85, 35-120 Hz...
TECHNICAL SPECIFICATIONS GEO M6B Module System specifications GEOM6B WITH NEXO TDCONTROLLER SETUP Frequency Response @-6 dB 70 Hz to 1kHz Sensitivity 1W@1m 94 dB SPL Nominal Peak SPL@1m 125 dB Nominal Impedance 8 Ohms Recommended Power 450 Watts PRODUCT FEATURES LF Component 1 x 6.5' 8 Ohms long excursion driver...
GEO M6 SERIES MODULES & ACCESSORIES LIST GEO M6 S & ERIES MODULES ACCESSORIES REFERENCE DRAWING DESCRIPTION GEO M620 GEO M620 Module GEO M6B GEO M6B Module DTD-IU Digital TD Controller Installation Version DTD-IN Digital TD Controller Installation Version - Dante...
Page 62
GEO M6 SERIES MODULES & ACCESSORIES LIST REFERENCE DRAWING DESCRIPTION Main GEOM6 Bumper GMT-BUMPER (up to 12 x GEO M6 maximum) GMT-EXBAR Extension Bar for GMT-BUMPER Light GEO M6 Bumper GMT-LBUMP (up to 3 x GEO M6 maximum) GMT-BPADPT-2 Stacking adaptor for GMT-BUMPER...
Need help?
Do you have a question about the GEO M6 Series and is the answer not in the manual?
Questions and answers