Nidec Leroy-Somer Gearlec Series Installation And Maintenance Manual

Low voltage alternator 4 pole

Advertisement

Quick Links

578
577
575
546
581
265
550
551
557
266
547
548
552
586
GEARLEC - TRACTELEC
GT3 / TF3 / TM3
Low Voltage Alternator - 4 pole
Installation and maintenance

Advertisement

Table of Contents
loading

Summary of Contents for Nidec Leroy-Somer Gearlec Series

  • Page 1 GEARLEC - TRACTELEC GT3 / TF3 / TM3 Low Voltage Alternator - 4 pole Installation and maintenance...
  • Page 2 Installation and maintenance Electric Power Generation 3472 en - 2019.05 / j GEARLEC - TRACTELEC GT3 / TF3 / TM3 This manual concerns the alternator which you have just purchased. We wish to draw your attention to the contents of this maintenance manual. SAFETY MEASURES a) During operation, do not allow anyone to stand in front of the air outlet guards,...
  • Page 3: Table Of Contents

    Installation and maintenance Electric Power Generation 3472 en - 2019.05 / j GEARLEC - TRACTELEC GT3 / TF3 / TM3 CONTENTS 1 - ACCEPTANCE ....................4 1.1 - Inspection ........................4 1.2 - Identification........................4 1.3 - Storage ..........................4 1.4 - Applications........................4 1.5 - Usage restrictions ......................4 2 - TECHNICAL CHARACTERISTICS ..............
  • Page 4: Acceptance

    Installation and maintenance Electric Power Generation 3472 en - 2019.05 / j GEARLEC - TRACTELEC GT3 / TF3 / TM3 1 - ACCEPTANCE 1.3 - Storage Whist awaiting commissioning, 1.1 - Inspection machines must be stored: Upon receipt of your generator, check that it - away from moisture: in effect, at relative has not suffered any damage in transit.
  • Page 5: Technical Characteristics

    Installation and maintenance Electric Power Generation 3472 en - 2019.05 / j GEARLEC - TRACTELEC GT3 / TF3 / TM3 2 - TECHNICAL voltage regulation: voltage proportional to the speed (U/F), CHARACTERISTICS - automatic build-up on the remanent 2.1 - Operating principle voltage.
  • Page 6: Voltage Regulation With Electronic Regulator

    Installation and maintenance Electric Power Generation 3472 en - 2019.05 / j GEARLEC - TRACTELEC GT3 / TF3 / TM3 GEARLEC Emergency power Power take-off shaft speed (min Three-phase 50 Hz GT3 - 16.5 16.5 GT3 - 20 19.5 GT3 - 27.5 27.5 GT3 - 30 GT3 - 35...
  • Page 7 Installation and maintenance Electric Power Generation 3472 en - 2019.05 / j GEARLEC - TRACTELEC GT3 / TF3 / TM3 Setting up the R120 - For a 60 Hz application : • Check that the strap U / F (marked - For a 50 Hz application : Frequency) is in position 60 Hz •...
  • Page 8: Installation And Comissionning

    Installation and maintenance Electric Power Generation 3472 en - 2019.05 / j GEARLEC - TRACTELEC GT3 / TF3 / TM3 3 - INSTALLATION AND to the tractor’s 3-point linkage. Ideally, the TRACTELEC should be placed on the COMMISSIONING ground, raising it sufficiently to align the Staff undertaking the various operations universal joint link with the tractor power indicated in this section must wear per-...
  • Page 9: Settings

    Installation and maintenance Electric Power Generation 3472 en - 2019.05 / j GEARLEC - TRACTELEC GT3 / TF3 / TM3 With configuration GEARLEC, in no case Connection checks should the internal connections in the Check that: terminal box be subjected to stresses - the TRACTELEC/GEARLEC is earthed due to cables connected by the user.
  • Page 10: Commissioning

    Installation and maintenance Electric Power Generation 3472 en - 2019.05 / j GEARLEC - TRACTELEC GT3 / TF3 / TM3 3.5 - Commissioning WARNING Please note that the power may be supplied to the electronic switchgear on condition that its current consumption does not exceed 40% of the rated current Before starting up, check that all between phase and neutral.
  • Page 11: Routine Maintenance

    Installation and maintenance Electric Power Generation 3472 en - 2019.05 / j GEARLEC - TRACTELEC GT3 / TF3 / TM3 4.2 - Routine maintenance Store your machine in a dry, airtight place to avoid condensation. 4.2.1 - Inspection after start-up After approximately 20 hours of operation, check that all fixing screws on the machine 4.3 - Fault detection...
  • Page 12: Electrical Faults

    Installation and maintenance Electric Power Generation 3472 en - 2019.05 / j GEARLEC - TRACTELEC GT3 / TF3 / TM3 4.5 - Electrical faults 4.6 - Electronic faults See the regulator maintenance manual, reference 5243. 4.7 - Dismantling the gearbox Electrical faults should be noted with the machine disconnected from the mains.
  • Page 13: Spare Parts

    Installation and maintenance Electric Power Generation 3472 en - 2019.05 / j GEARLEC - TRACTELEC GT3 / TF3 / TM3 5 - SPARE PARTS 5.1 - Technical support service 5.2 - Technical support service Our technical support service will be pleased provide additional...
  • Page 14: Exploded View And Parts List Gt3 / Tf3 / Tm3

    Installation and maintenance Electric Power Generation 3472 en - 2019.05 / j GEARLEC - TRACTELEC GT3 / TF3 / TM3 5.2 - Exploded view and parts list GT3 / TF3 / TM3...
  • Page 15 Installation and maintenance Electric Power Generation 3472 en - 2019.05 / j GEARLEC - TRACTELEC GT3 / TF3 / TM3 No. Nbr. Description No. Nbr. Description Connecting flange Electrical unit (Tractelec) 12 Assembly nut Control module (Tractelec) 30 mA residual current protection Chassis (Tractelec) switch (3P+N) (Tractelec) Three-phase male + female socket...
  • Page 16: Disposal And Recycling Instructions

    Installation and maintenance Electric Power Generation 3472 en - 2019.05 / j GEARLEC - TRACTELEC GT3 / TF3 / TM3 Disposal and recycling instructions The oil and grease from the lubrication system should be treated as hazardous committed limiting waste and must be treated in accordance environmental impact of our activity.
  • Page 17: Declaration Of Ec Compliance And Incorporation

    Installation and maintenance Electric Power Generation 3472 en - 2019.05 / j GEARLEC - TRACTELEC GT3 / TF3 / TM3 Declaration of EC compliance and incorporation This Declaration applies to the generators designed to be incorporated into machines complying with the Machinery Directive Nr 2006/42/EC dated 17 May 2006.
  • Page 18 Installation and maintenance Electric Power Generation 3472 en - 2019.05 / j GEARLEC - TRACTELEC GT3 / TF3 / TM3...
  • Page 19 Service & Support Our worldwide service network of over 80 facilities is at your service. This local presence is our guarantee for fast and efficient repair, support and maintenance services. Trust your alternator maintenance and support to electric power generation experts. Our field personnel are 100% qualified and fully trained to operate in all environments and on all machine types.
  • Page 20 Linkedin.com/company/Leroy-Somer Twitter.com/Leroy_Somer_en Facebook.com/LeroySomer.Nidec.en YouTube.com/LeroySomerOfficiel 3472 en - 2019.05 / j...

Table of Contents