Installation
BTS
DC System Grounding point
[Electrode Conductor
(i.e., ground busbar)]
Figure 2-4, DC and Battery Temperature Sensor Wiring
Page 13
MS-PE Series
Inverter/Charger
Inverter's DC Negative Busbar
Inverter's DC Positive Busbar
Inverter's Equipment Ground Wire
Battery Temp Sensor Cable*
MMP-E enclosure – designed for single inverter
installations (includes DC disconnect breaker, DC shunt for
battery monitor, and inverter DC busbars). If multiple
inverters will be installed, use a MP-E enclosure – designed
to allow up to four inverters to be connected together.
Battery Bank's Equipment Ground Wire
Battery Bank's Negative Cable
Battery Bank's Positive Cable
Battery Bank
(front view)
BTS