Ensure that you have the steel cable on the correct side and that you have the proper direction of
rotation for coiling up the steel cable.
Ø 50 mm
1.
Feed the cable through the opening.
2.
Place the retainer clamp at the end of the steel cable.
3.
Wind at least 2 strokes before loading the cable.
Gnd
g
4
Need help?
Do you have a question about the LM.125 and is the answer not in the manual?