Installation; Space Requirements - Pilous ARG 200 plus Instruction Manual

Hide thumbs Also See for ARG 200 plus:
Table of Contents

Advertisement

3. Installation

3.1. Space requirements

You can install the machine on any suitable and even floor (concrete) in a factory hall. Observe the allowed floor load.
Remove the wooden frame. Set the machine on the place designated for use. Level the machine with washers (not included in the
shipment). Remove the anticorrosion film and dust from sliding surfaces and apply oil. Attach the length stop. Ensure connection to
the mains (see section 3.3.). After you open the door in the machine base, check whether the outlet coolant pipe has not fallen out of
the coolant tank cover and is fitted well inside. Pour the coolant (approximately 15/35 litres, see the Technical Data) into the tank; the
fluid will gradually flow into the container in the base. Fasten the lifting lever with screws in the holes in the grey cast iron arm as
shown in the picture in Section 4. Machine description.
When handling coolants, risks linked to hazardous substances cannot be avoided. Observe the national norms
and recommendations and manufacturer's or your company's operating instructions related to safe handling
of coolants.
Recommendations/requirements:
• Allow for sufficient space for the feeding and removal of the workpiece and the machine maintenance - the operator's working area
should be delineated at 1 m minimum around the machine and 0.5 m around the roller conveyors.
• Install roller conveyors and/or a case for cut pieces collection for a safe handling of workpieces and to prevent accidents due to
pieces falling off.
• We recommend that you anchor the machine to the floor, especially when installing the roller conveyors.
• Install a lift mechanism for heavy workpieces.
• Ensure proper lighting at the workplace.
0,5 m
A
D
1m
DANGER ZONE LIMITS
B
E

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents