Installation Process - LG B70AWYN985 Installation Manual

Ceiling concealed duct air conditioner
Table of Contents

Advertisement

INTRODUCTION
6

Installation process

Determination of division work
Preparation of contract drawings
Sleeve and insert work
Installation of indoor unit
Refrigerant pipe work
Drainage pipe work
Duct work
Heat insulation work
Electrical work
(connection circuits and drive circuits)
Airtight test
Vacuum drying
Additional charge of refrigerant
Fit facing panels
Test run adjustment
Transfer to customer with explanation
CAUTION
!
• The above list indicates the order in which the individual work operations are normally car-
ried out but this order may be varied where local conditions warrants such change.
• The wall thickness of the pipe should comply with the relevant local and national regula-
tions for the designed pressure 3.8MPa.
• Since R-410A is a mixed refrigerant, the required additional refrigerant must be charged in
its liquid state.(If the refrigerant is charged in its gaseous state, its composition changes
and the system will not work properly.)
Indicate clearly who will be responsible for switch setting.
Make connection clearly between outdoor, indoor, remote controller and option.
Take account of gradient
of drainage pipe
Check model name to make
sure the fitting is made correctly
Special attention to dryness,
cleanness and tightness
Adjust to downward gradient
Make sure airflow is sufficient
Make sure no gaps are left where
the insulating materials are joined
Multiple core cable must not be used.
(suitable cable should be selected)
In the final check for 24hours at 3.8 MPa(38.7 kgf/cm
The vacuum pump used must have a capacity of reaching at least 5 torr, more than 1 hour
Recharge correctly as calculated in this manual. and record the amount of added refrigerant
Make sure there are no gaps left between the facing materials used on the ceiling
Run each indoor unit in turn to make sure the pipe work has been fitted correctly
Explain the use of the system as clearly as possible to your customer and make sure all relevant
documentation is in order
Outdoor unit foundation work
Installation of outdoor unit
2
) there must be no drop in pressure.
The foundation must be level even
Avoid short circuits and ensure
sufficient space is allowed for service

Advertisement

Table of Contents
loading

This manual is also suitable for:

B70awyux85

Table of Contents