Checking The Drainage - LG B70AWYN985 Installation Manual

Ceiling concealed duct air conditioner
Table of Contents

Advertisement

PRODUCT INSTALLATION
16
The method to rejoin the indoor unit
is as follows.
① Sub drain pan and the fan deck section to-
gether with the 5 screws.
② Carefully align the heat exchanger section
and fan deck section.
③ Lift the heat exchanger section about
50mm, push it forward and then back
down And screw the 5 screws the heat ex-
changer section with unit.
Lift up
④ Secure the two sections together with the
5 bolts. Re-attach the side lock strap.
Heat exchanger
section
Side lock
strap
Fan deck section
⑤ Re-connect the unplugged cables.
Reassemble the control box cover.
⑥ Carefully replace the fan deck section top
cover and secure the cover with the
screws.
Heat exchanger
section
Fan deck section
CAUTION
!
Please be sure to secure two section with
5 screws. if one of screw is missing, it
could cause unbalance of product or capac-
ity degradation.

Checking the Drainage

Checking the Drainage
* Check the drainage.
- Spray one or two glasses of water upon the
evaporator.
- Ensure that water flows drainage hose of
indoor unit without any leakage.
Fan deck
top cover

Advertisement

Table of Contents
loading

This manual is also suitable for:

B70awyux85

Table of Contents