Install A Switch Blade - NETGEAR M6100 Series Installation Manual

Campus edge and smb core chassis switch, switch blades, daughter cards
Hide thumbs Also See for M6100 Series:
Table of Contents

Advertisement

Install a switch blade

To install a switch blade in a M6100 series chassis switch:
1.
Select a slot for the switch blade.
2.
Remove a blank front panel from the chassis slot, if necessary.
Any unoccupied switch blade slot in the chassis must have a blank
faceplate installed to ensure satisfactory protection from EMI and to
maintain adequate airflow through the chassis.
3.
Remove the switch blade from the antistatic packaging.
CAUTION:
metal rail and front panel only. Never touch the components on the
PCB or the pins on any of the connectors.
4.
Verify that the switch blade injector-ejector handles are open.
5.
Keep the injector-ejector handles in the open position as you slide the
switch blade into the chassis slot.
CAUTION:
the injector-ejector handles are in the latched position.
To prevent ESD damage, hold the switch blade by the
Do not slide the switch blade into the open chassis slot if
7

Advertisement

Table of Contents
loading

Table of Contents