Connecting The Power Rail Interface; Connecting The Profibus Interface; Connecting The Operating Voltage - Siemens 6ES7 972-4AA02-0XA0 User Manual

Power rail booster
Table of Contents

Advertisement

User´s Guide Power Rail Booster
6.3.2.3

Connecting the Power Rail interface

The connection is established via the 15-pin terminal block on the front of the
PRB.
Because of their low capacitance, all cables to the contact rail on the Power
Rail side, such as incoming cables and connecting cables, should be
PROFIBUS cables. In principle, however, it is also possible to use other cable
types, in which case the maximum cable length must match the cable
capacitance.
Pin - Nr.
Name
10
A1
11
A2
12
B1
13
B2
14
15
Fig. 21: Terminal assignment for the Power Rail interface
6.3.2.4

Connecting the PROFIBUS interface

PRBs are equipped with an electrical port with RS 485 level. This port takes the form
of a 9-pin D Subminiature socket with screw-type locking mechanism. Bus lines A
and B are galvanically isolated from the 24 V supply voltage and the Power Rail
voltage. The port is located on the front of the PRB.
For the PROFIBUS DP side, the installation guidelines contained in the
"SIMATIC NET PROFIBUS Networks" manual apply.
Connect the RS 485 bus segment using a PROFIBUS bus connector. If the PRB
is located at the beginning or end of a bus segment, the bus terminator on this
interface must be switched on.
All PROFIBUS bus connectors in the network must be screwed tightly into the RS
485 interface.
Make sure that the bus segment connected to the RS485 interface is terminated
at both ends.
Pin - Nr.
Name
1
n.c.
2
n.c.
3
RxD/TxD-P
4
RTS
5
GND
6
VCC
7
n.c.
8
RxD/TxD-N
9
n.c.
Fig. 22: Terminal assignment for the PROFIBUS RS485 interface
6.3.2.5

Connecting the operating voltage

The operating voltage is connected via the 15-pin terminal block on the front of the
PRB. The connection is protected against polarity reversal. Pins 1-2 and pins 3-4 are
jumpered internally.
Copyright © Siemens AG 2005 All rights reserved.
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
Function
Contact rail A, first sliding contact
Contact rail A, second sliding contact
Contact rail B, first sliding contact
Contact rail B, second sliding contact
Functional ground
Functional ground
Function
Reserved
Reserved
Data line B
Request to send
Ground
Supply voltage
Reserved
Data line A
Reserved
6ES7 972-4AA02-0XA0
Version 12/2005
Page 31 of 49