Step 11 Performing The Drainage Test - Samsung AC071RN4PKG Installation Manual

Hide thumbs Also See for AC071RN4PKG:
Table of Contents

Advertisement

Indoor unit
NOTE
Full thread bolt hanger
Individual
air vent
Main drain pipe

Step 11 Performing the drainage test

1
a
Flexible hose
Hose
b
Max. 30˚
1000 to 1500 mm
Main air vent
(must be installed)
200 mm
or more
300 to
550 mm
Centralized horizontal drain
pipe
(more than 1/100 slope)
Water leakage
check part
c
CAUTION
2
a
b
CAUTION
15
English

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ac rn4pkg series

Table of Contents