Support For Service; Supporting Methods; Note For Replacement Of P.c.boards; Replacement Of The Lithium Battery On The A-P.c.board - Panasonic PT-DZ6710U Service Manual

Dlp based projector
Hide thumbs Also See for PT-DZ6710U:
Table of Contents

Advertisement

PT-DZ6710U / PT-DZ6710E / PT-DZ6700U / PT-DZ6700E / PT-DW6300US / PT-DW6300ES / PT-D6000US / PT-D6000ES

7 Support for Service

7.1.

Supporting Methods

We will support according to the following methods.
Supporting methods
Replaced by module or block
Replaced by discrete components
Replaced
department
7.2.

Note for Replacement of P.C.Boards

7.2.1.
When replacing the A-P.C.Board
· Transfer the data of the original A-P.C.Board to the new A-P.C.Board using the adjustment software and a personal computer.
· If you cannot transfer the data that uses the adjustment software, remove IC3102-IC3104 from the original board and mount
them on the new board.
· Set the model name according to the item 8. "MODEL" in the paragraph 4.3.1. "EXTRA OPTION".
* Consult your dealer or Authorized Service Center for the adjustment software.
7.2.2.
When replacing the WL-P.C.Board
· When WL-P.C.Board is replaced, explain that to the customer because the MAC (Media Access Control) address for wired LAN
is changed.
7.3.

Replacement of the lithium battery on the A-P.C.Board

If the lithium battery will be empty, replace it with a new one (CR2032 or equivalent).
Cautions
· Explosion may occur if replacing the battery with an incorrect one.
· Dispose of used batteries according to the instructions.

8 Cautions for Service

Service or repair the product according to service information on the service manual, etc. so that a fire, injury or electric shock
caused by an improper repair may not occur.
1. Do not modify equipments, components and materials when attempting to service or repair.
2. Do not repair nor connect wires even in case of a part of the disconnection when the wiring unit is supplied as a replacement
parts, replace the wiring unit (complete).
3. For a fasten terminal (push-in type terminal), pull out or insert straightly without twisting it.
4. When the fuse has blown, do not turn on the power supply replacing only the fuse because the secondary disaster of fumes,
fire or other hazards is expected. Turn on the power supply after doing the confirmation and measures of defective causes
(structure and circuit, etc.).
5. After the service or the repair is completed, confirm the operation of the product is normal.
6. Do handling and safekeeping carefully because the user setup information remains in the projector.
8.1.

Servicing Methods

· Never unplug the power cord from the outlet, open the circuit breaker, or perform other procedures to cut off the power line
during the operation of any cooling fan.
· Be sure to unplug the power cord from the power outlet before servicing.
Powering off the projector
1. Press the POWER STANDBY "
2. Select "OK" with
FM-Module
Ballast-Module (For specified components, supplies them discretely.)
Power-Module
Rod (complete)
Full Reflection Mirror (complete)
Liquid Cooling Unit
Mechanical Shutter Unit
ACF Drive Unit
Other components
at
the
manufacturing
DMD block
" button.
or
button and press the ENTER button. (or press the POWER STANDBY "
Applied parts
22
" button again.)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents