Download Print this page

Alton EVOLUTION OCTAGONAL Instruction Manual page 3

Optional extras
Hide thumbs Also See for EVOLUTION OCTAGONAL:

Advertisement

Low Level Louvre (Optional)
Diagram 134
EV0975
EV1059
EV0979
525mm x 100mm
D729
EV610X128
50mm
Screw
Internal Diagram 136
Inside
Outside
584mm
Diagram 135
External
Next slot the right hand side rail (EV0976) onto
the right hand side of the louvre. You can then
slide the last plain board (EV1059) up into the
mid rail and then secure that with a piece of
panel capping.
From the inside of the building you need to drill
two pilot holes through the cill section of the
greenhouse frame (diagram 136). Make sure the
hole is central to the cedar louvre frame and then
fix with a 50mm screw.
Once the frame is installed you can fit the louvre
glass. Carefully slide each piece into the glass
retainers until it hits the small stop.
3
EV0976
EV1059
First
assemble
louvre,
follow
instruction on page 25.
Insert one of the plain
boards (EV1059) into the
greenhouse on the left
hand side below the mid
rail (diagram 135), secure
this with a piece of panel
c a p p i n g
( E V 0 9 7 9 ) ,
diagram 135.
Next insert a side rail
(EV0975). You can now
insert the louvre up into
the mid rail and across
into the EV0975 and hold
it in place.
Trim a 'H' shaped glass
separator
to
584mm
long and place this on
top of the small pane of
glass (EV610X128) and
insert this below the
louvre.
the
the
1

Advertisement

loading
Need help?

Need help?

Do you have a question about the EVOLUTION OCTAGONAL and is the answer not in the manual?

Questions and answers