• Press PLUS-Key for test start. After successful termination of the test green LED
"TWA" is on. If the test runs with an error the LED is off.
Attention: During test execution all data in Eeprom will be erased and default data
will be wrote into Eeprom.
7. Test program
• Set BCD-switch in position 7. Display shows:
• Press ENTER-Key. Test process will be started with following steps.
• Heating 24ºC
• Pre Cleaning (30s)
• Chemical 1 (30s)
• Cleaning 1 (30s)
• END
8. Cleaning test program
Set BCD-switch in position 8. Display shows:
• All bottles have to be filled with water
• Press ENTER-Key and close the cover
• After finishing the program display shows END