Exchanging the upper lift arm sensor 10.2 Exchanging the lower lift arm sensor 10.3 Exchanging the air distributor sensor 10.4 Exchanging the cover sensor 10.5 JOBO Labortechnik GmbH + Co. KG Kölner Str.58 D-51645 Gummersbach (Derschlag) Made in Germany Technical modifications are reserved 09097...
Page 2
Servicing the control panel Replacing the EPROM 15.1 Exchanging the power switch 15.2 Disassembling switch and display PC-board 15.2.1 Disassembling the main PC-board 15.3 JOBO Labortechnik GmbH + Co. KG Kölner Str.58 D-51645 Gummersbach (Derschlag) Made in Germany Technical modifications are reserved 09097...
1.2.2 Pull out drain valve knob 1.2.3 Remove Phillips screws from base Assembly advice: The drain valve knob must positively lock when pushed in (snapping sound) JOBO Labortechnik GmbH + Co. KG Kölner Str.58 D-51645 Gummersbach (Derschlag) Made in Germany...
- Remove screw. - Pull fastening ring apart. - During assembly, the fastening ring must lock in place at bottle neck. JOBO Labortechnik GmbH + Co. KG Kölner Str.58 D-51645 Gummersbach (Derschlag) Made in Germany Technical modifications are reserved...
- Disassemble control panel (according section 1.4.) - Pull cord out of opening. Water Assembly in reverse sequence. Advice: Seal cord opening with additional silicon. JOBO Labortechnik GmbH + Co. KG Kölner Str.58 D-51645 Gummersbach (Derschlag) Made in Germany Technical modifications are reserved 09097...
- Pull push-on connectors off main PC-board. - Attach new sensor with silicon - Remove sensor. Solder connections and insulate solder point. Sensor Level sensor JOBO Labortechnik GmbH + Co. KG Kölner Str.58 D-51645 Gummersbach (Derschlag) Made in Germany Technical modifications are reserved 09097...
- Disassemble gear segment. Loosen 4 screws of lift arm and remove lift arm. Open unit - Loosen 2 mounting screws of motor and remove motor. Lift arm motor JOBO Labortechnik GmbH + Co. KG Kölner Str.58 D-51645 Gummersbach (Derschlag) Made in Germany Technical modifications are reserved 09097...
Attention: Protect base from residual water draining from pump when disassembling. Assembly in reverse sequenceService Documentation JOBO Labortechnik GmbH + Co. KG Kölner Str.58 D-51645 Gummersbach (Derschlag) Made in Germany Technical modifications are reserved 09097...
15.3 Disassembling the main PC-board Open unit - Loosen (5) socket screws at PC-board - Pull off connectors - Remove PC-board JOBO Labortechnik GmbH + Co. KG Kölner Str.58 D-51645 Gummersbach (Derschlag) Made in Germany Technical modifications are reserved 09097...
Page 10
Servicemenue ATL 1500 1. Start of service test • Set BCD-Switch in position 16 • Press PLUS and ENTER-Key simultaneously and the switch unit on (SET DEF mode = setting of default values). • Simulate a closed cover by putting a magnet to the sensor on the left side of the control unit.
Page 11
• Press PLUS-Key for test start. After successful termination of the test green LED “TWA” is on. If the test runs with an error the LED is off. Attention: During test execution all data in Eeprom will be erased and default data will be wrote into Eeprom.