4: Connecting To A Fire Alarm Control Panel (Facp); 5: Connecting To The Pnet-1 Surge Suppressor - Honeywell Notifier MODBUS-GW Installation And Operation Manual

Modbus gateway
Table of Contents

Advertisement

Installation
2.3.4 Connecting to a Fire Alarm Control Panel (FACP)
Panel is shown for illustrative purposes only. The
MODBUS-GW is mounted within the FACP cabinet and
connected with the NUP connection located on the
FACP.
2.3.5 Connecting to the PNET-1 Surge Suppressor
20
FACP
Figure 2.9 Connecting to an FACP
MODBUS-GW
Figure 2.10 Connecting to the PNET-1
MODBUS-GW Installation and Operation Manual — P/N LS10015-000NF-E:C2 4/30/2019
NUP Cable Provides Both
Power and Communication
From FACP
NUP Connector
MODBUS-GW
J3
PNET-1
Connections
To NUP "A"
(J4) only
Not Used
Ground