Viessmann Vitoradial 300-T VR3 Service Instructions For Contractors page 7

Condensing boiler with heat exchanger, 101 to 335 kw
Hide thumbs Also See for Vitoradial 300-T VR3:
Table of Contents

Advertisement

Steps - commissioning, inspection and maintenance
Commissioning steps
Inspection steps
Maintenance steps
1. Settings at the boiler control unit.....................................................................................
2. Checking the connections of the neutralising system and filling with neutralising
agent
3. Commissioning the system...............................................................................................
4. Checking the burner adjustment......................................................................................
5. Shutting down the system.................................................................................................
6. Opening the boiler door.....................................................................................................
7. Cleaning the internal pipes and heating surface............................................................ 10
8. Checking the gaskets and packing cords on the flue gas side
9. Checking the thermal insulation components on the boiler door................................. 10
10. Inserting the internal pipes............................................................................................... 11
11. Fitting the boiler door........................................................................................................ 11
12. Checking connections and sensor well on the heating water side for tightness
13. Checking the function of the safety equipment.............................................................. 12
14. Checking the function of the pressure switch................................................................ 12
15. Checking the temperature controller setting if a building management system is
used (DCC system)............................................................................................................ 12
16. Checking the expansion vessel and system pressure................................................... 12
17. Checking the firm seating of electrical plug-in connections and cable grommets
18. Checking the heat exchanger gasket............................................................................... 14
19. Cleaning the flue outlet and heat exchanger................................................................... 17
20. Checking the water quality................................................................................................ 17
21. Checking the neutralising system according to the manufacturer's instructions;
replacing used agent
22. Cleaning the sight glass in the boiler door...................................................................... 18
23. Checking the mixer for ease of operation and tightness............................................... 18
24. Checking the function of the return temperature raising facility (if installed)
25. Checking the installation room ventilation
26. Checking the flue pipe and all connections from the heat exchanger to the flue
system for tightness
27. Restarting the system
28. Adjusting the burner.......................................................................................................... 19
29. Instructing the system user.............................................................................................. 20
30. Operating and service documents................................................................................... 20
Commissioning, inspection, maintenance
Page
8
8
8
9
9
7

Advertisement

Table of Contents
loading

Table of Contents