Download Print this page

Toro 110-5076 Installation Instructions page 2

Footswitch upgrade kit for multi-pro 5600 turf sprayer

Advertisement

Figure 1
1. Front hood, left side
2. Floor pan
4. After the wiring is above the floor pan reinstall
the front hood and secure it with the cover
bolt.
Step
3
Installing the Floor Switch
Parts needed for this step:
1
Floor switch
1
Wiring harness
2
Hex-head screw (1/4 inch)
2
Lock washer (1/4 inch)
2
Nut (1/4 inch)
4
Wire tie
Procedure
1. Place the new floor switch in the area as shown
in Figure 2, near the old switch location, and
use the switch to mark locations for drilling
holes.
2. Remove the new switch and drill two 1/4 inch
holes in the floor pan at drill points marked in
the previous step.
3. Mount the new floor switch using the two
hex-head screws (1/4 inch), two lock washers
3. Bolt
4. Existing oor switch wiring
(1/4 inch) and two nuts (1/4 inch) provided in
loose parts (Figure 2).
Figure 2
1. New oor switch
2. Hex head screw (1/4 inch)
4. Connect the three prong connector on the
new wiring harness to the three prongs on the
floor switch.
5. Connect the old floor switch connector to the
matching connector on the new wiring harness
(Figure 3).
Figure 3
1. New oor switch,
connected to wiring
harness
2. Old wiring harness,
connecting to new wiring
harness
2
3. Lock washer (1/4 inch)
4. Nut (1/4 inch)
3. Wire ties
4. New wiring harness and
relays, secured to frame

Advertisement

loading