DUAL MEDIUM INTENSITY STROBE
2.5.2
C:\Documents and Settings\esalazar\Local Settings\Temporary Internet Files\OLK1\E-1DB Rev 10 06 03.doc
12/1997, Rev. 04/13/1998 (Dwgs. Revised) Rev. 07/6/1999, Rev. 01/13/2000
Rev. 07/2000 (o2 L/H), Rev. 10/17/2000 (Retyped)
Rev 03/28/03 (Removed #600-02)
MODEL E-1DB
Lighting Kit Wiring
Install wiring between the controller to the beacon utilizing strobe cable
(TWR LIGHTING CANNOT WARRANTY SYSTEMS THAT
method.
EMPLOY SPLICING CABLE.)
600-01 for install of light kits. Following these minimum guidelines as well as
any local or end user additional requirements, installing light kits will require
lifting of the cable by the supplied cable grip or conduit to affix to the tower.
Always work safely and adhere to all OSHA Safety Guidelines when lifting
wiring or working on the structure or tower itself.
responsibility to install the lighting kit in a safe manner. Installers can
request from OSHA their requirements 29CFT 1926.21 and 29CFR
1926.105 to ensure compliance to regulations.
NOTE
:
On occasion, a set of custom lighting kit drawings may be
specifically requested by a customer and installed in this manual. In cases
such as this, the drawings will proceed the manual if a conflict occurs.
All the necessary information for wiring the dual beacon and sidelights is
contained on the tower kit drawings 600 and 600-01. The connections for
the dual beacon and sidelights in the controller are as follows:
2.5.2.1
Connect the 10 gauge Red/Black wire from beacon wiring to
TB1-1.
2.5.2.2
Connect the 10 gauge Red wire from beacon wiring to TB1-2.
2.5.2.3
Connect the 10 gauge Black wire from beacon wiring to
TB1-3.
2.5.2.4
Connect the 14 gauge White wire from beacon wiring to
TB1-4.
2.5.2.5
Connect the 14 gauge White/Green wire from beacon wiring to
TB1-5.
2.5.2.6
Connect the 14 gauge Green wire from beacon wiring to the
Refer to drawings HDO-269, 600 and
It is the installer's
5