16 Installation
e) Connect the cables to their connections on the ZBIB board (the ground
connection is shown below in step 4).
f) Wind the remaining cables into the plastic bag again.
4. The kit includes a plate for the customer cable screens. Attach the small bracket and
the ground connection first, then the full clamp plate.
5. Attach the control unit into the cabinet. Use the fixings prepared earlier.
6. Continue to install the drive module and customer cabling as described in the
hardware manual.
7. When installation is complete, connect the control cables to the drive module in
reverse order to that described in
installation. Make sure to:
a) Pull the cables through the rubber grommet.
b) Check that the cables are not against sharp edges or bare live parts.
Note: Bending radius of the fibre optic cables is at least 3.5 cm (1.38 in.). Do not bend
fibre optic cables during the assembly.