Advertisement

Quick Links

723830218
Owner's Manual
& Assembly Guide
Gloves must be worn
at all times to reduce
risk of injury!

Customer Service:

1-800-851-1085
assist@arrowsheds.com
BUILDING DIMENSIONS
Approx.
Storage
Size
10' x 2'
21 Sq. Ft. 133 Cu. Ft.
2
3,0 m x 0,6 m
2,0 m
* See Inside for Detailed Safety Information.
or
Size rounded off to the nearest foot
Exterior Dimensions
(Roof Edge to Roof Edge)
Area
Width
Depth
123 1/4"
30 3/4"
3,8 m 3
313,3 cm
78,1 cm
Model No.
Base
Size
Interior Dimensions
(Wall to Wall)
Height
Width
Depth
82 1/8"
118 1/4"
25 1/2"
208,6 cm
300,4 cm
64,8 cm
www.arrowsheds.com
C ED102
VD102
10' x 2'
121" x 28 1/4"
307,3 cm x 71,8 cm
For proper base construction see page 12
Opening
Height
Width
Height
80 7/8"
55 1/2"
69 1/4"
205,4 cm
141,0 cm
175,9 cm
01DS
Nominal Size

Advertisement

Table of Contents
loading

Summary of Contents for Arrow Storage Products VD102C

  • Page 1: Customer Service

    01DS 723830218 Owner’s Manual & Assembly Guide www.arrowsheds.com Model No. C ED102 VD102 Gloves must be worn at all times to reduce 10’ x 2’ risk of injury! Nominal Size Customer Service: 1-800-851-1085 Base 121” x 28 1/4” assist@arrowsheds.com Size 307,3 cm x 71,8 cm BUILDING DIMENSIONS For proper base construction see page 12...
  • Page 2 GB: Assembly manual in additional languages available online. Scan QR code below to access. FR: Manuel de montage disponible en ligne dans d’autres langues. Pour y accéder, scannez le code QR ci-dessous. SP: Manual de montaje en idiomas adicionales disponible online. Escanee el código QR a continuación para acceder.
  • Page 3: Safety Precautions

    SAFETY PRECAUTIONS... Safety precautions MUST be followed at all times throughout the construction of your building! Practice caution with the tools being used in the Care must be taken when handling various pieces assembly of this building. Be especially familiar with of your building since many contain sharp edges.
  • Page 4 ASSEMBLY TIPS & TOOLS Watch the Weather Closely: Be sure the day you choose to install your building is dry and calm. Do NOT attempt to assemble your building on a windy day. Be careful on wet or muddy ground. Use Teamwork: Two or more people are required to assemble your building.
  • Page 5 FREQUENTLY ASKED QUESTIONS How long will it take to assemble the building? Assembly time depends on a variety of factors, including roof design, tools available, DIY skill and the pace at which you work. Guidelines for each shed assembly are approximate AFTER completion of the base, and assume two or more people working on the assembly.
  • Page 6 What kind of base do I use? You can: •Use an Arrow Base Kit •Pour a concrete slab •Build a wood deck/fl oor (use exterior-grade plywood) •Use patio blocks •Build on crushed gravel, dirt or grass Arrow provides a base kit accessory that is an option for most building sizes. If you are building a wood deck/fl oor, an Arrow fl...
  • Page 7 What if the rear wall angle and channels are too large to fi t inside of the rear wall panels? Check the dimensions of wall assemblies. They should be slightly smaller than the fl oor frames. Lay the assemblies on top of the rear fl oor frame and pull them up to the top of the wall panels causing the corner panels to stand erect and not lean inward.
  • Page 8 HARDWARE LIST... 07DG Hardware Views by Key No. Key Part Part Qty. Description List 65103 Hex Nut (#8-32 x 11/32) 65900A Black Screw (#10B x 1/2) (13mm) 65923 Small Bolt (#8-32 x 3/8) (10mm) 65004 Small Screw (#8AB x 5/16) (8mm) 66646 Washer Sheet 66045...
  • Page 9: Table Of Contents

    PARTS LIST... 08DG Key Part Part Qty. Selected End Views by Key No. Description List 9367 Front Floor Frame 8934 Ramp 8984 Side Floor Frame 8936 Rear Floor Frame 5288 Corner Post 5287 Splice Post 9366 Door Track 6403 Door Track Splice 6637 Side Wall Angle 9338...
  • Page 10 ASSEMBLY BY KEY NO. 09DG...
  • Page 11 ASSEMBLY OVERVIEW 10AE Install Corner Post, Door Track, Side Build the Floor Frame. Wall Angles, and Rear Wall Angle. Install Siding Studs. Install Splice Post and Door Jambs. Install Rear Siding Panels. Install Side Siding Panels.
  • Page 12 ASSEMBLY OVERVIEW 11AE Install Right and Left Gables. Install Front Siding Panels. Install Roof Panels. Install Roof Beams. Install Ridge Cap, Side Trim, and Install Doors Corner Cap. Shed is now complete.
  • Page 13 CONSTRUCTING A BASE... 12DG No matter which of the options below you choose for a base, an ARROW ANCHORING KIT is recommended as an effective method of properly securing your building after assembly is complete. OPTION 1: Directly on ground (earth) Assemble your building directly on level ground (grass, dirt, rock, sand, etc.).
  • Page 14: Ramp

    Step 1: Floor Frames 13DG You will need for this page: Washers are to be used on 9367 8934 painted parts only. Washers are not necessary on unpainted parts and there are not enough Front Floor Ramp (QTY: 8) Frame to use on every screw and bolt.
  • Page 15 Step 1: Floor Frames 14DG You will need for this page: 8936 Rear Floor (QTY: 5) Frame 8936 Assemble the Rear Floor Frames. Overlap two (2) Rear Floor Frames as shown and secure with fi ve (5) bolts. Two (2) bolts must enter from bottom.
  • Page 16 Step 2: Wall Frame 15DG You will need for this page: 9338 9339 Left Rear Right Rear (QTY: 1) Wall Angle Wall Angle Overlap the Right and Left Rear Wall Angles as shown and secure using one (1) Small Bolt and Nut through the center hole.
  • Page 17 Step 3: Door Track 16DG You will need for this page: 6403 9366 66769 9366 (QTY: 4) Track Splice Door Track Door Slide Align two (2) Door Tracks with the four (4) holes in 6403 the bottom of the Door Track Splice and insert four (4) Small Screws.
  • Page 18: Side Floor Frame

    Step 4: Frame Assembly 17DG You will need for this page: Assemblies from Step 1: 8984 • Front Floor Assembly (1) • Rear Floor Assembly (1) Side Floor (QTY: 8) (QTY: 2) Frame Do NOT fasten your Floor Frames to your Base at this time. You will anchor your building after it is erected.
  • Page 19: Splice Post

    Step 5: Posts/Top Frames 18DS You will need for this page: Assemblies from step 2: 5288 6637 • Rear Wall Angle Assembly (1) Assemblies from step 3: Side Wall • Door Track Assembly (1) (QTY: 18) Corner Post Angle Position Corner Posts at the corner of the Floor Frame as shown.
  • Page 20: Door Track

    Step 6: 19DG Splice Post/Door Jamb/ Studs You will need for this page: 5287 9344 7311 (QTY: 4) (QTY: 8) (QTY: 4) Splice Post Siding Stud Door Jamb Position Splice Post at the center of the rear wall and fasten to Rear Wall Angle using four (4) Small Bolts and Nuts and two (2) Small Screws to the Floor Frame.
  • Page 21 Step 7: Side Siding 20DG You will need for this page: Washers are to be used on painted parts only. Washers 8827 9365 are not necessary on unpainted parts and there Front Wall are not enough to use on every (QTY: 4) (QTY: 26) Side Siding...
  • Page 22 Step 8: Rear Siding 21DG You will need for this page: Washers are to be used on painted parts 8736 only. Washers are not necessary on unpainted parts and there are not enough to use on every Screw and Bolt. Rear Siding (QTY: 14) (QTY: 24)
  • Page 23 Step 9: Front Siding 22DG You will need for this page: 8737 Front Siding (QTY: 24) Slide Front Siding into channels of Corner Posts and Door Jambs as shown. Once in place, secure Panels from inside the building to the Corner Posts and Door Jambs using four (4) Small Screws per Panel.
  • Page 24 Step 10: Gables 23DG You will need for this page: 6001 6000 5971 Roof Beam Left Gable Right Gable Bracket (QTY: 8) GABLES STACKED TOGETHER DURING SHIPPING MISTAKEN FOR ONE GABLE! SEPARATE GABLES BEFORE CONTINUING. Edge Trim Apply Edge Trim to the top edge of the Right Gables and Left Gables.
  • Page 25: Side Wall Angle

    Step 10: Gables 24DG You will need for this page: 6635 (QTY: 8) (QTY: 3) Gable Brace Working with one (1) Gable at a time, attach Gable must fi t UNDER the Rear Gables to the Rear Wall Angle with Side Wall Angle at corner.
  • Page 26 Step 10: Gables 25DG You will need for this page: 6635 6228 (QTY: 12) (QTY: 2) Gable Brace Track Sup. Working with one Gable at a time, attach the front Gables to the Door Track with eight (8) Small Screws. Do not insert screws into the two (2) holes closest to the peak of each Gable.
  • Page 27: Roof Beam

    Step 11: Roof Framing 26DG You will need for this page: 6659 (QTY: 12) Roof Beam Position the Roof Beams as shown below and install using two (2) Small Bolts and Nuts per side. Install the Main (center) Beams fi rst. Beam End Views Angled side of Beams must face up.
  • Page 28: Roof Panel

    Roof Install Prep Page 27DG Use the information on this page to complete step 12. Measure the building diagonally again to make sure the building is square. The building should be square at the base and at the top. This will make roof panels fi...
  • Page 29 Step 12: Roof Assembly 28DG You will need for this page: 6543 67293 Weather Roof Panel Stripping (QTY: 24) (QTY: 20) Following the diagram on the previous page attach Roof Panel to center roof beam using four (4) Small Screws. Remove Edge Trim from front and back gables under roof panel. Continue installation of Roof Panel using eight (8) Small Screws and ten (10) Small Bolts and Nuts as shown.
  • Page 30: Side Roof Trim

    Step 13: 29DG Ridge Cap/Roof Trim You will need for this page: 6868 6014 66183 66183 67468 Left Corner Side Roof Right Corner (QTY: 4) Ridge Cap Trim Peak Cap (QTY: 4) Install Peak Caps and Ridge Cap using four (4) Small Bolts and Nuts as shown.
  • Page 31: Door

    Step 14: Door Assembly 30DG You will need for this page: 10472 3719 6301 Door Handle Brace Vert. Brace (QTY: 3) (QTY: 2) Handle Do not fully tighten the bolts that hold on the Door Attach the Door Handle and Door Handle until the Vertical Door Brace is in place.
  • Page 32: Horizontal Door Brace

    Step 14: Door Assembly 31DG You will need for this page: 10497 Horiz. Brace (QTY: 6) Door Guide Slide Horizontal Brace over Door edge and secure with one (1) bolt and nut in top and bottom. Secure the Door Guides and Lower Horizontal Door Brace as shown below.
  • Page 33 Step 15: Door Install 32DG You will need for this page: Assemblies from Step 14: • Right Door Assembly (1) • Left Door Assembly (1) (QTY: 8) Gable Door Slide From inside the building, place the bottom of the Door into the Front Floor Frame track at about the half- Door Track open position.
  • Page 34 ANCHORING OPTIONS... IMPORTANT: • If you have swing doors, they must hang and swing level before anchoring building. • Anchor your building at this time. See below for details on anchoring. • If you have purchased a Floor Frame Kit, you should install it at this time. •...
  • Page 35 CARE & MAINTENANCE... Exterior Care: For a long lasting fi nish, clean and wax the exterior surface. We recommend washing with a mild soap solution. DO NOT use power washing to clean your shed. Using a spray automotive type wax periodically on the exterior is highly recommended if you are in a high humidity or coastal climate region.

This manual is also suitable for:

Ed102

Table of Contents