17. SAFETY

Please read the following safety regulations with care before
installing and using the charging system.

17.1 Safety instructions

Before you install the charging station, you must make sure the location is
safe for all bystanders. NEVER allow children onto this worksite. Never allow
ANYONE who has nothing to do with the work onto the worksite.
- Never be distracted while you are performing the work.
- Make sure you maintain a healthy posture at all times while doing the work.
- Do not leave any tools or charging station components unattended.
- Make sure any tools you are using are clean and dry.
- Make sure that the charging station, tools and components will stay dry
when it is raining.
When switching off the power of the system, always make
sure the measurement instrument used for testing this is
checked for proper operation repeatedly.

18. MANDATORY CHECKS BEFORE COMMISSIONING

The following checks are mandatory before commissioning the
Homebox. NEVER use the Homebox if 1 or more checks indica-
te that the power supply or the stability of the Homebox does
not meet the requirements.
Always perform the following checks before switching on the
power supply of the Homebox
√ All the following work must be carried out in full conformity with NEN 3140.
√ Check if the terminals have been properly tightened (3.5 to 5 NM).
√ Check the earth connection.
√ Check if the power cable thickness matches the fuse value.
√ Check if the Homebox has been mounted securely.