OSO HOTWATER Maxi Geocoil MGC 400 Installation Manual

OSO HOTWATER Maxi Geocoil MGC 400 Installation Manual

Hide thumbs Also See for Maxi Geocoil MGC 400:

Advertisement

Quick Links

SAFETY INFORMATION

O&M INFORMATION

INSTALLATION MANUAL

TDS – TECHNICAL DATA SHEET
Manufactured by OSO Hotwater AS
Industriveien 1 - 3300 Hokksund - Norway
Tel: + 47 32 25 00 00 / Fax: + 47 32 25 00 90
E-mail: oso@oso.no / www.osohotwater.com
146196-00 - 05-2018
Maxi Geocoil - MGC
400 l.
EN

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Maxi Geocoil MGC 400 and is the answer not in the manual?

Questions and answers

Summary of Contents for OSO HOTWATER Maxi Geocoil MGC 400

  • Page 1: Safety Information

    O&M INFORMATION INSTALLATION MANUAL TDS – TECHNICAL DATA SHEET Manufactured by OSO Hotwater AS Industriveien 1 - 3300 Hokksund - Norway Tel: + 47 32 25 00 00 / Fax: + 47 32 25 00 90 E-mail: oso@oso.no / www.osohotwater.com...
  • Page 2: Table Of Contents

    CONTENTS 1. Safety instructions ..........3 General information ........3 1.2 Safety instructions for users ..... 4 1.3 Safety instructions for installers ..... 4 2. Product description ..........5 2.1. Product identification ........5 2.2. Intended use ........... 5 2.3 CE marking ............5 2.4 Technical data ..........
  • Page 3: Safety Instructions

    1. SAFETY INSTRUCTIONS 1.1 General information • Read the following safety instructions carefully before installing, maintaining or adjusting the buffer tank. • Personal injury or material damage may result if the product is not installed or used in the intended manner. •...
  • Page 4: Safety Instructions For Users

    1.2 Safety instructions for users WARNING The overflow from the safety valve must NOT be sealed or plugged. The product must NOT be modified or changed from its original state. Children must NOT play with the product or go near it without supervision. Maintenance/settings should only be carried out by persons over 18 years of age, with sufficient understanding CAUTION...
  • Page 5: Product Description

    Conformity at www.osohotwater.com for more • Safety standard EN 60335-2-21 information. • Welding standard EN ISO 3834-2 The product complies with EU Directives for: OSO Hotwater AS is certified for • Low voltage LVD 2014/35/EU • Quality ISO 9001 • Electromagnetic compatibility EMC 2014/30/EU •...
  • Page 6: Installation Instructions

    3. INSTALLATION INSTRUCTIONS 3.1 Products covered by these instructions 800 1852 Maxi Geocoil - MGC 400 3.2 Included in delivery Number Description Buffer tank with electrical peak load + coil Installation manual (this document) Junction box with 3 elements/thermostats PT valve 10 bar/99°C (supplied loose) Feet (factory-fitted) 3.3 Product dimensions All dimensions in mm.
  • Page 7: Requirements For Installation Location

    3.3.1 Delivery The product should be transported carefully as shown, with packaging. Use the handles in the box. CAUTION Pipe stubs, valves etc. should not be used to lift the product as this could cause malfunctions. 3.4 Requirements for installation location and positioning CAUTION The product should be placed in a room with a drain, in accordance with the wetroom standard / latest TEK.
  • Page 8: Pipe Installation

    3.5 Pipe installation The product is designed to be permanently con- nected to the mains water supply. Approved pipes of the correct size should be used for installation. The relevant standards and regulations must be followed. Dimension Connection description Ventilation / hot water (supp- 3/4”...
  • Page 9 3.5.4 Fitting instructions CAUTION The product should be placed in a room with a drain, in accordance with the wetroom standard / latest TEK. Alternatively, fit an automatic stop valve with sensor and overflow from safety valve to drain. The product should be properly aligned vertically and horizontally, on a floor suitable for the total weight of the product when in operation.
  • Page 10: Electrical Installation

    3.6 Electrical installation Fixed electrical fittings must be used for instal- as shown. Supply wires should be secured with suitable strain relievers. lation. Any electric fittings must be installed by B) Internal wires from connection piece (1) to an authorised electrician. The relevant standards thermostats and the wires from thermostats to and regulations must be followed.
  • Page 11 3.6.4 Fitting instructions WARNING The product should be filled with water before the power is switched on. Fixed electrical fittings must be used for installation according to the regulations. Any electric fittings must be installed by an authorised electrician. The mains cable should withstand 90°C. A suitable strain reliever must be fitted. CAUTION The product must have a clearance for servicing of 40 cm in front of the cover.
  • Page 12: Initial Commissioning

    4. INITIAL COMMISSIONING 4.1 Filling with water 4.5 Handover to end-user First check that all pipes are connected correctly. THE INSTALLER MUST: Then fill the tank according to the needs/require- Brief the end-user on safety and maintenance ments of the system. Make sure that the tank is instructions.
  • Page 13: User Guide

    5. USER GUIDE 5.1 Settings 5.1.1 Thermostat setting WARNING The product’s thermostats are adjustable from 60-90°C. The thermostat should not be set lower Constant voltage present in the junction box. Be- than 65°C to prevent bacteria growth. To adjust fore any electrical work is done, the power supply the temperature: must be disconnected and secured against acti- A) Disconnect the power supply.
  • Page 14: Troubleshooting

    6. TROUBLESHOOTING 6.1 Faults and fixes If problems arise when the product is in use, installer (see product type plate) or OSO Hot- check for possible faults and fixes in the table. water AS - see section 7.1. If you are unsure what is wrong, contact the TROUBLESHOOTING Problem Possible cause of fault...
  • Page 15: Warranty Conditions

    7. WARRANTY CONDITIONS 1. Scope OSO Hotwater AS (“OSO”) warrants for 5 years from the date of works, has been in regular use, and the water quality is as purchase that the Product will: i) conform to OSO specifications, ii)
  • Page 16 OSO Hotwater AS Industriveien 1 3300 Hokksund - Norway Tel: + 47 32 25 00 00 oso@oso.no www.osohotwater.com © This installation manual and all its content is protected by copyright and may be reproduced or distributed only with written consent from the manufacturer.