ABB AWT420 Commissioning Instructions page 17

Universal 4-wire, dual-input transmitter
Hide thumbs Also See for AWT420:
Table of Contents

Advertisement

AW T4 2 0 | U N I V E R S A L 4 - W I R E , D U A L- I N P U T T R A N S M I T T E R | C I/A W T4 2 0 - E N R E V. B
Referring to Figure 14:
7 Fit alignment tab
I
into gland plate slot
variant) or in the casting slot (on metal case variant).
8 Insert EZLink connector body
align the connector body using the flats on the alignment
washer (see Figure 13).
9 Screw back nut
J
onto connector body and tighten using
a spanner.
I
K
L
J
Figure 14 Securing the EZLink connector cable assembly
K
(on plastic case
fully into cable entry and
L
Referring to Figure 15:
10 Place EZLink cable plug
cradle
A
.
11 Plug connector block cradle
Figure 15 Connecting the EZLink cable assembly
12 If a second EZLink module is required, repeat all steps.
13 Close and lock transmitter door
M
into EZLink connector block
into EZLink module
A
B
.
17
.
N

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents