Transport And Start Up; Transport And Installation; Assembly - Jet JRT-2 Operating Instructions Manual

Table of Contents

Advertisement

Available languages

Available languages

4.4  Unit description 
A ........ Mitre gauge 
B ........ Adjustable fence 
C ........ Lateral workpiece guide 
D ........ Workpiece hold down 
E  . ........ Dust port 
F  . ........ Hole for router height adjustment 
G ........ Table extensions 
H ........ Legs 
I.......... Machine table 
J ......... Magnetic On/ Off switch 
K ........ Support s 
L  . ........ Feather board 
R ........ Switch overload cut‐off 
 
5.  Transport and start up 
5.1 Transport and installation 
The tool is designed to operate in closed rooms and must be 
placed stable on firm and levelled surface. 
The tool can be bolted down. 
 
 
Fig 1 
Fig 2 
5.2 Assembly 
If you notice any transport damage while unpacking, notify 
your supplier immediately. Do not operate the machine! 
Dispose of the packing in an environmentally friendly manner. 
 
Attach the Legs: 
Attach the legs (H, Fig 3) to the table (I) with the supplied pan 
head screws and nuts (L). 
 
Attach the Switch: 
Attach the switch (J, Fig 1) with 2 screws. 
 
Attach the Table Extensions (Fig 4): 
Attach the table extensions (G, Fig 1) and supports (K) with pan 
head screws and nuts. 
 
 
Attach the Router (Fig 5, Fig 6): 
Attach the router to the mounting plate (T, Fig 5) by use of 
supplied screws (U). 
6
Fig 3 
Fig 4 
 
 

Advertisement

Table of Contents
loading

Table of Contents