Brocade Communications Systems 6542 Hardware Reference Manual page 47

Blade server san i/o module for inspur shangri-la chassis
Table of Contents

Advertisement

 
 
 
 
 
 
FIGURE 9 Unlocking the release lever and latch
 
 
1. Release lever and latch in unlocked position
 
You will feel the switch module unseat and move out of the I/O module bay approximately 0.6 cm
(0.25 inch).
6. Slide the switch module out of the I/O module bay and set it aside.
 
 
 
NOTE
If you are not inserting a replacement switch module in the I/O module bay, use a filler blade to fill the
empty slot in order to maintain proper airflow and cooling. Do not leave the slot empty.
7. Insert the replacement switch module in the I/O module bay of the blade server chassis. You must
complete this step within 60 seconds.
8. Insert the SFP+ optical transceivers.
9. Reconnect the cables.
 
Brocade 6542 Blade Server SAN I/O Module for Inspur Shangri-la Chassis Hardware Reference Manual
53-1003885-01
Managing the Switch Module
47

Advertisement

Table of Contents
loading

Table of Contents