Installing The Engine - Takeuchi TB 250 Workshop Manual

Hide thumbs Also See for TB 250:
Table of Contents

Advertisement

1. Disconnect the battery ground cable from the battery
terminal.
2. Remove the canopy.
"Removing the canopy"
3. Remove the floor frame.
"Removing the floor frame"
4. Disconnect the electrical wiring to the air cleaner (14).
5. Remove the air cleaner (14).
6. Remove the radiator.
"Removing the radiator"
7. Remove the drain hose.
"Removing the radiator"
8. Remove the hydraulic pump.
"Removing the hydraulic pump"
9. Disconnect the fuel hoses.
"Removing the fuel tank"
10. Disconnect the battery cable and the electrical wirings
from the engine side.
• Attach an identification label to each wiring.
11. Disconnect the engine ground cable (11).
12. Disconnect the accelerator wire from the engine, and
remove it together with the bracket.
"Adjusting the engine throttle lever"
13. Take out the bolts and remove the cushion rubbers (8)
and (9).
Bolt: ThreeBond #1324
Bolt: 102 N·m
14. Suspend the engine.
: 170 kg

Installing the engine

For installation of the engine, follow the same procedure as
for removal in the reverse order.
DISASSEMBLY AND ASSEMBLY
4-6
4
DRIVE SYSTEM

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents