Integrating UCS Components in the Dynamic Rack
Step 4
Reset CIMC to Factory Defaults
For the 3160/3260: Log off the CIMC Management GUI and exit the CIMC GUI Management KVM console.
For the 3160:
a) Reboot server node and choose <F8> Cisco IMC Configuration to enter CIMC Configuration Utility
from the server node KVM connection.
b) Choose <F1>Additional Settings.
c) Down arrow to FactoryDefaults[]field.
d) Click the spacebarso that there is a[X].
e) Choose <F10>Save.
For the 3260:
a) Reboot server node and choose <F8> Cisco IMC Configuration to enter CIMC Configuration Utility
from the server node KVM connection.
b) Choose <F1>Additional Settings.
c) Down arrow to FactoryDefaults/Chassis Controller Configuration[]field. (The Server Controller
Configuration can be ignored as all CMC/BMC IP address information will be reset to factory defaults
with the Chassis Controller Configuration option).
d) Click the spacebarso that there is a[X].
e) Choose <F10>Save.

Shipping the Rack

Shipping Guidelines

After you complete the testing of a preracked UCS system, prepare the rack for shipment by following these
guidelines:
• To reduce the possibility of equipment damage or personal injury, remove all of the equipment that is
• Tool-less rail kits must be secured into the rack rails using screws.
• The cables that connect to the fabric interconnect chassis may be bundled and secured using Velcro straps
• Special shock pallets must be used to ship approved racks with preinstalled UCS components. These
• The original packing materials that come with approved racks can be reused. These packaging materials
• Carriers offering specialized, air-ride, padded vans are recommended for shipping all configured racks.
not mechanically secured to the rack rails before shipment. The only Cisco UCS components that can
be shipped preracked are certified Cisco UCS components with supplemental hardware. See
Placement Guidelines, on page 62
prior to shipping. Secure all data and power cables.
pallets were designed and tested for approved racks. They are designed only for one-way shipping and
must not be reused after the integrated rack reaches its final destination.
are designed for use with the approved racks.
White glove service is encouraged and recommended.
for more information.
Cisco R42612 Rack and RP-Series Metered Input PDU Installation Guide
Shipping the Rack
Equipment
83