Cisco RP Series Installation Manual page 19

Rack and metered input pdu
Hide thumbs Also See for RP Series:
Table of Contents

Advertisement

Unpacking the Rack
This chapter contains the following sections:
Unpacking a Cisco R-Series Rack
This section describes how to unpack and prepare a Cisco R42612 rack to be moved to its installation site.
The Cisco R42612 rack ships on a wooden pallet with cardboard and plastic covering the rack.
Note
You will probably need to perform this procedure in the loading dock area of the building. A fork lift or chain
hoist may be needed.
Remove the Packaging
To remove the protective packaging from the Cisco R42612 rack, complete the following steps:
Procedure
Step 1
Remove the nylon straps that secure the cardboard sheathing.
Step 2
Remove the cardboard top piece.
Step 3
Remove the plastic latches that hold the cardboard sheathing together, as shown in the following figure.
Unpacking a Cisco R-Series Rack, on page 17
Remove the Packaging, on page 17
Accessories , on page 19
Safety Guidelines, on page 20
Removing the Cisco Cisco R42612 Rack from the Pallet, on page 21
C H A P T E R
Cisco R42612 Rack and RP-Series Metered Input PDU Installation Guide
3
17

Advertisement

Table of Contents
loading

This manual is also suitable for:

R42612 r seriesRack2-ucsRack2-ucs2Rack2-ucs2-int

Table of Contents