Site Preparation
This chapter contains the following sections:

General Site Requirements and Recommendations

When planning your installation of the Cisco R42612 rack, consider the following:
• The unpacking and installation process requires three logistical steps:
• Select an unpacking location with adequate surrounding space for the unloading process. You must allow
• Choose an installation site that can accommodate the Cisco R42612 rack. To provide for future installation
• Make sure you have enough people to help you safely unload and install the system. A fully-loaded
• Plan a smooth and unobstructed route from the off-loading site to the installation site. You should only
Required Tools, on page 6
Grounding, on page 13
Power Source, on page 13
Power Requirements, on page 13
• Unloading the unit from the vehicle in which it is shipped
• Using a forklift or similar device to move the unit to an unpacking site
• Moving the unpacked unit to the installation site
for the pallet.
of a joined configuration, you should plan enough space for additional cabinets that occupy the same
amount of space as the initial cabinet.
cabinet can weigh over 3000 lb (1360.8 kg) and moving it can present dangers to both personnel and the
incorporate equipment.
move the rack when it is empty of all equipment.
C H A P T E R
Cisco R42612 Rack and RP-Series Metered Input PDU Installation Guide