Site Preparation Checklist
Site Preparation Checklist
Planning the location and layout of your equipment rack or wiring closet is essential for successful network
operation, ventilation, and accessibility. The following table lists the site planning that we recommend
completing before installing a Cisco R42612 rack or PDU.
Table 2: Site Planning Checklist
Task No.
1
2
Cisco R42612 Rack and RP-Series Metered Input PDU Installation Guide
14
Activity
Space evaluation:
• Space and layout
• Floor covering
• Impact and vibration
• Lighting
• Maintenance access
Environmental evaluation:
• Ambient temperature
• Humidity
• Altitude
• Atmospheric
contamination
• Air flow
Verified By
Time
Site Preparation
Date