Installation; What Must Be Done In Case Of Transport Damages - SMA Sunny Boy 2000 Technical Description

The transformerless string inverter for photovoltaic plants
Table of Contents

Advertisement

Sunny Boy 2000

3 Installation

The installation of the Sunny Boy String Inverter must be conducted
by qualified personnel. The installer must be approved by the local
electricity company.
Please read this chapter carefully before installation.
Pay attention to all safety requirements, the connection regulations
imposed by the local electricity company and the VDE regulations.

3.1 What must be done in case of transport damages?

The inverters are thoroughly checked before they are shipped. Even though they are
delivered in a sturdy packaging (which can be recycled) the inverters can be dam-
aged in transit.
Please inspect your inverter thoroughly after it is delivered. If any damages can be
detected on the packaging that could make you conclude the contents is damaged or
if you detect that the inverter is damaged please immediately notify the forwarding
company.
SMA or your local supplier can help you in this matter. In any case a declaration of
transport damage must be made within 6 days upon receipt of the product and must
be stated in writing directly to the forwarding agent. If it is necessary to return the
inverter to the manufacturer please use the packaging the inverter was sent in (if it is
still functional). Only then can transport damages be avoided as far as possible. SMA
cannot provide warranty for damages resulting directly or indirectly from unsuitable
transport packaging.