Ecosoft ROBUST 1000 Installer And User Manual page 20

Reverse osmosis systems
Hide thumbs Also See for ROBUST 1000:
Table of Contents

Advertisement

INSTALLER AND USER GUIDE FOR REVERSE OSMOSIS SYSTEM ECOSOFT ROBUST 1000, ROBUST 3000
Pressure tank is not full when
the system switches off
This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2016
Contamination of pressure
tank
Tank bladder is over inflated
Tank valve is closed
Sanitize pressure tank.
Pressure tank may become
contaminated if filters or
membranes are used beyond
their service life.
Pressure in empty tank
bladder must be 0.6–1.0 bar
(8.7–14.5 psi). Release some
pressure if necessary.
Check tank valve position.
47

Advertisement

Table of Contents
loading

This manual is also suitable for:

Robust 3000

Table of Contents