IDEAL PRO Series Installation And Servicing page 29

Table of Contents

Advertisement

Electrical
Any electrical work shall be carried out by a suitably competent person fully in accordance
with the latest edition of the IEE requirements for electrical installations BS7671.
The appliance requires a suitable 230v AC mains supply rated at 5amp fed via a double-
pole linked isolator with a contact separation of 3mm in both poles. Details of how to
connect to the external wiring required (and the wiring provided) are shown below.
The 3kW immersion heater will require its own 230v AC mains supply. This shall be
rated at 16amp and fed via a double-pole linked isolator with a contact separation of
3mm in both poles. Details of how to wire the immersion heater are shown on page 16.
Both isolators shall be located immediately adjacent to the appliance and suitably
identified/labelled to allow safe use/maintenance.
The connections within the wiring centre are shown below.
3. Fully Pumped System,
3 x 2-Port Spring Return
Zone Valves.
3
2
N
RMT
1
2
4
230
RET
L
3
N
230
RET
L*
1
N
230P*
COM CALL
N
ROOM THERMOSTAT
(Zone 1)
3
1
N
RMT
1
2
4
230
RET
L
3
N
230
RET
L*
1
N
230P*
COM CALL
N
ROOM THERMOSTAT
(Zone 2)
* Link terminals L and
Com in the RET230P for
correct operation. (See
thermostat instructions
for further information).
4. Gravity DHW and
Note.
Pumped Heating,
For Ideal Logic Heat and System boilers with Outside Weather Compensation Kits fitted an additional connection is required between
one 2-Port Spring
Pin 16 of the wiring centre, the Programmer/Time switch Hot Water Off signal and the Boiler SL2 IN. Refer to the wiring diagrams on
Return Zone Valve in
page 15 for detail.
DHW.
3
2
N
RMT
1
2
4
230
RET
L
3
N
230
RET
L*
1
N
230P*
COM CALL
N
ROOM THERMOSTAT
(Zone 1)
IDEAL SYSTEM READY
1
2
3
4
5
6
7
8
L
N
4
Brn.
L
N
Motor
MAINS SUPPLY
L
(Fuse 3A)
HP22, 2-PORT HTG VALVE
(Zone 1)
15
14
5
1
2
Brn.
Motor
COM CALL
HP22, 2-PORT HTG VALVE
ATC CYLINDER
(Zone 2)
THERMOSTAT
8
L
N
12
Brn.
Perm
N
Sw.
L
L
Motor
** BOILER
L
HP22, 2-PORT DHW VALVE
** Refer to Boiler wiring
information for boilers
with pump overrun.
1
2
3
4
5
6
7
L
N
L
N
MAINS SUPPLY
(Fuse 3A)
Page 29
5
N
7
N
Brn.
Blue Wh.
L
N
9 10 11 12 13 14 15 16
N
6
7
Blue
Or.
Gr.
PROGRAMMER
N
OUT
IN.
Aux. Sw.
CP715 Si, FP715 Si
& TP9000
SET3M, SET 3E
& FP975
SET2E
N
6
7
102, 102E5, 102E7
4033
Blue
Or.
Gr.
3060 & 3020P
N
OUT
IN.
TIMESWITCH
L
Aux. Sw.
WIRING CENTRE
103, 103E5, 103E7
TS715 Si
N
6
7
SET1E & TS975
Blue
Or.
Gr.
N
OUT
IN.
Supplementary
Aux. Sw.
Guide
Thermostat type
13
N
TPoneM
L
N
TPoneB
** PUMP
8
9 10 11 12 13 14 15 16
15
8
1
2
PROGRAMMER
COM CALL
CP715 Si, FP715 Si
ATC CYLINDER
& TP9000
THERMOSTAT
SET3M, SET 3E
& FP975
SET2E
4
14
13
102, 102E5, 102E7
4033
Gr.
Or.
A. Permanent Links
B. Links to be made by
installer
L
N
N 11
10
9
N
L
ON
ON
LINKS
WATER
HTG
-
N
L
3
4
-
N
L
1
4
L, 2 & 5
-
N
L
1
4
L-2, 1-5
-
N
L
1
2
7
6
4
2
7
6
4
2
N.B. WHEN USING UNITS BELOW LINK 11-9 ON
-
N
L
1
-
-
N
L
4
-
-
N
L
4
-
Earth
DHW
Zone 1
Earth
Neutral
11
10
9
n/a
N
L
No2
No1
n/a
n/a
COM
n/a
n/a
A. Permanent Links
B. Links to be made
L
N
by installer
N 11
10
9
N
L
ON
ON
LINKS
WATER
HTG
-
N
L
3
4
-
N
L
1
4
L, 2 & 5
INSTALLATION
-
N
L
1
4
L-2, 1-5
-
N
L
1
2
7
6
4
2
-
L-3
1-6
-
L-3
L-1
L-5
Zone 2
1
n/a
NO
-
L-3
1-6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents