IDEAL PRO Series Installation And Servicing page 26

Table of Contents

Advertisement

IDEAL SYSTEM READY
6
5
Sh1 /1
MIP-926-P1
5
0
Minimum Cupboard Width =
329
282
487
1
528
579
616
673
700
Wiring Centre
1
2
3
SYSTEM DESIGN
14/09/2017
Alternate CH Position Added
REVISION
DATE
6
5
4
Minimum Cupboard Width =
700
329
4
700
Cylinder
Hot Outlet
Cylinder
Immersion /
Hot Outlet
Wiring Centre
Control Stat
2
3
4
5a
5
Immersion /
Control Stat
7
6
Gledhill Building Products Ltd
Sycamore Estate
Blackpool
FY4 3RL
4
5a
Tel No: 01253 474550
Fax No: 01253 474551
APPROVED
4
5
3
3
0
0
282
342
10
392
9
442
8
282
543
7
566
6
342
10
627
392
9
442
700
8
543
566
Status
For Review
This drawing is the property of
Gledhill Building Products Ltd 
Material Specification
and may not, without the express
Page 26
written consent of the company, be
627
copied in whole or in part, or used
Original Scale:
1 : 4
Tolerance +/- 3.0mm
for any purpose other than that for
which it is supplied.
All Dimensions In Millimetres
Do Not Scale
If In Doubt-Ask
3
Additional Component Kit
Potable System - Separate Components
In addition to the fitted equipment, the
folowing potable water system components
are provided separately for site fitting:
• Potable water expansion vessel precharged
to 3 bar - see below for details.
• Flexible hose connection
Potable Water Expansion Vessel Sizes
Pre-Plumbed
Appliance Reference
IDEPROIN180PPSR
IDEPROIN210PPSR
IDEPROIN250PPSR
IDEPROIN300PPSR
The expansion vessels are suitable for wall
mounting in the cupboard above the appliance
and are supplied with an integral mounting
bracket as well as a flexible connector as shown
opposite.
2
Fitting Template
A first fix fitting template is supplied with the
Description
Number
unit to allow for the first fix pipework to be
2
1
CH Zone 1
installed prior to the connection of the unit.
2
CH Zone 2
3
Flow From Boiler
4
Return To Boiler
CH Return (120/150)
5
CH Return (180 up)
5a
Description
Number
6
Tundish Outlet
1
CH Zone 1
Secondary Circulation
7
2
CH Zone 2
8
Balanced Cold Feed
Mains Cold Supply
9
3
Flow From Boiler
10
Hot Water Feed
4
Return To Boiler
CH Return (120/150)
5
All pipe holes are optional.
All pipe hole sizes are dictated by the
CH Return (180 up)
5a
property / design. Therefore are a general indication.
The template is a general guide for installation
6
Tundish Outlet
rather than a rule that must be followed without
deviation.
Secondary Circulation
7
8
Balanced Cold Feed
Mains Cold Supply
9
10
Hot Water Feed
All pipe holes are optional.
All pipe hole sizes are dictated by the
property / design. Therefore are a general indication.
The template is a general guide for installation
rather than a rule that must be followed without
deviation.
Drawn
Date
Project
StainlessLite Pro
Andrew T
14/09/2017
Date
Checked
Title
PP Floor Template
Eng. Approval
Date
Drawing No
MIP-926
Mfg. Approval
Date
2
Vessel Size
(Litres)
18
25
25
35
1
D
Size (mm)
1
22
22
28
28
22
22
D
Size (mm)
22
22
22
22/28
22
22/28
28
22/28
28
C
22
22
22
22
22/28
22/28
22/28
C
B
A3
B
A
Rev No.
Sheet No.
P1
1 /1
1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents