Assy Rollerguide; Spring Earth Vc; Spring Guide Earth Vc; Guide S Vc - Sanyo HR-VX200 Basic Service Technical Information

Vc mechanism
Table of Contents

Advertisement

4-21. ASSY ROLLER GUIDE
(Refer to Fig. 4-21-1.)
1)
Rotate
the
"assy,
roller,
guide"
@
in
the
counterclockwise
direction
and remove.
PRECAUTIONS
ON ASSEMBLY
1)
After
assembling,
clean
the
"guide
roller"
and
perform
"5-3. Adjusting
Tape Path".
*
, @ Assy, roller, guides
Fig. 4-21-1
4-22. SPRING EARTH VC
(Refer to Fig. 4-22-1.)
Note:
Some models may not be attached with a "spring,
earth VC" @.
1)
Remove
the "special
screw"
~,
and remove
the
"spring earth VC" @.
PRECAUTIONS
ON ASSEMBLY
1)
Tighten
the "special
screw"
~ with a 6 to 7 kg/cm
torque.
2)
After
attaching,
check that the tip of the shorter
"spring,
earth VC" @ is inside the hole @ and that
the longer
one is parallel
to the right edge of the
mechanism
chassis.
ial screw
pring, earth vc
Fig. 4-22-1
-28-
4-23. SPRING GUIDE EARTH VC, GUIDE S
VC (Refer to Fig. 4-23- 1.)
Note:
Some models may not be attached with a "spring,
guide earth VC" o.
1)
Remove
the tip of the "spring,
guide
earth VC" ~
from the hole @ and pull it out.
2)
Remove the clamp @, and remove the "guide, s VC"
a.
@
Guide, s vc
@ Spring, gui
earth vc
@ Clamp
@
Hole
Fig. 4-23-1
.-
-

Advertisement

Table of Contents
loading

Table of Contents