Sanyo HR-VX200 Basic Service Technical Information page 27

Vc mechanism
Table of Contents

Advertisement

i
8)
9)
After assembling,
check if the tape loading and tape
unloading
operations
are performed
properly.
After assembling,
clean the "incline
pin" and "assy,
roller,
guide"
of-the
"assy,
mounting,
incl s VC" ~,
and
"incline
pin"
and
"assy,
roller,
guide"
of the
"assy,
mounting,
incl t VC" @.
00
-0
@)
Assy,
incl t vc
/
incl s vc
Adjust the position to the
Adjust the position to the
notch of the mechanism
notch of the mechanism
chassis and then remove.
chassis and then remove.
Q
Gear,
load t
@ Gear, loads
I
er,
load s
Apply grease (VHJ-0100) to the shaped part.
Fig. 4-20-3
0.5mm
Fig. 4-20-4
Fig. 4-20-1
@Clamp
~ Gear, load t
I
@Spring,
I
Gear, load s
@ Assy, lever, 10
pring, load s
I
lb
@
Gear, load t
ar,
load s
Align the posit
Fig. 4-20-5
incl t vc
and the surrounding
area
cline pin
of the rail.
$%!!?
0
-O
Assy, mounting,
incl s vc
@
Assy,
mounting,
incl
t vc
@Assy,
mounting, incl s Vc
Apply grease
(VHJ-0100).
Fig. 4-20-6
Assy, ro~er, guide
u+~~
Assy, roller, guide
Incline pin
Fig. 4-20-2
-27-

Advertisement

Table of Contents
loading

Table of Contents