7. Level 2 Repair
7-5. Assembly
1
1)Attach components on Front.
(RCV module, Sensor FPCB, Motor and SUB PBA)
2)Attach OCTA and SUB PBA Connector
※ Caution
1) Be care of coaxial cable damage
3
Attach EMI Tape(4), Flooding label and Main
CAM in PBA
※ Caution
1) Be care of FPCB damage and tilt
2) Be care of press power/time
Confidential and proprietary-the contents in this service guide subject to change without prior notice
Distribution, transmission, or infringement of any content or data from this document without Samsung's written authorization is strictly prohibited.
2
Attach 2 coaxial cable, Screw 4point in SUB
PBA.
※ Caution
1) Be care of chip damage nearby screw point.
Assembly the PBA at the front.
4
And attach 2 coaxial cables.
※ Caution
1) Be care of components FPCB.