Assembly And Installation Instructions - FFS Brands Vizu 400 Pass Through Multi Stack Manual

Table of Contents

Advertisement

Vizu 400 Pass Through Multi Stack's
All
operation before leaving the factory.
Upon delivery please check the unit for damage. If the unit is damaged, contact the carrier,
or Fast Food Systems, immediately and file a damage claim (found in the back of the
manual) Please retain all packing materials.
Damage must be reported within 7 days of delivery
General Description
The unit has been designed to hold cooked foods in a humid atmosphere. Being a pass-thru
unit the machine can be loaded from one side and unloaded from the other.

Assembly and Installation Instructions

1. Unpack machine from packaging
2. Peel all surfaces of plastic film and wipe down with warm soapy water
3. Position machine on a level surface
4. Machine must be affixed to a fresh mains water supply, or side mounted bottle filled
daily with fresh water
5. Machine must be plugged into a 13Amp power supply.
6. Install all removable parts including; Element Cover, Side mounted 'Rack Supports',
Gastro Pans and wire racks.
7. Install racking by sliding it into the 'Rack Supports'
8. Make sure all parts are seated correctly by checking all parts at both sides of the
machine.
have been tested and checked for proper
Page 6 of 28

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vizu vi400ptms

Table of Contents