Verify environmental requirements

The environmental and electrical requirements for the physical site must be met to
ensure that your system works reliably.
Before installing a Storwize V3500 system, you must verify that adequate space in
a suitable rack is available. You must also ensure that the requirements for power
and environmental conditions are met.
This guide assumes that you have completed the physical planning for the
environment of your system. If you have not done the environmental planning for
your system, see the "Storwize V3500 physical installation planning" topic in the
IBM Knowledge Center for Storwize V3500.

Review enclosure location guidelines

Before you install the enclosure, you must be familiar with these enclosure location
guidelines.
v Position the enclosure in the rack so that you can easily view it and access it for
v Locate the enclosure low enough for the rack to remain stable.
v Ensure that you provide a way for two or more people to install and remove the