Verify Environmental Requirements; Review Enclosure Location Guidelines - IBM FlashSystem 5000 Series Quick Installation Manual

Table of Contents

Advertisement

Direct current power replaceable units
The DC power supply model has two replaceable units.
Table 22. Direct current power replaceable units
Description
Direct current power supply
Direct current power cable
The procedure to remove and replace the DC power supply unit is the same as the AC power supply
procedure.
When replacing the DC power cable, follow the instructions for disconnecting cables from the DC power
distribution unit.

Verify environmental requirements

The environmental and electrical requirements for the physical site must be met to ensure that your
system works reliably.
Before installing a system, you must verify that adequate space in a suitable rack is available. You must
also ensure that the requirements for power and environmental conditions are met.
This guide assumes that you have completed the physical planning for the environment of your system. If
you have not done the environmental planning for your system, see the "Physical installation planning"
topic in the IBM Knowledge Center for FlashSystem 5000 .

Review enclosure location guidelines

Before you install the enclosures, you must be familiar with these enclosure location guidelines.
• Position the enclosure in the rack so that you can easily view it and access it for servicing.
• Locate the enclosure low enough for the rack to remain stable.
• Ensure that you provide a way for two or more people to install and remove the enclosure.
FRU part number
01AC311
00AR087
Chapter 3. Before you begin the installation 19
Customer replaced
Y
Y

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Flashsystem 5010Flashsystem 5030

Table of Contents