28
3. Key in LOAD \TEST 11757". Press
for the controller to load the program. The LED
on the disk drive will go out when the program has
nished loading.
4. When the controller has nished loading the program,
press
or key in RUN to start the program.
4
5
RUN
Screen #1 allows the user to set the date and time of
the test.
The second screen displays information only. Press
or
4
5
4
5
ENTER
EXECUTE
a. If you want to change the displayed date and time,
key in \Y" and press
the displayed instructions.
b. If you
want to change the displayed
do not
date and time, key in \N" and press
.
4
5
EXECUTE
Screen #3 allows the user to enter the MFS's serial
number, humidity, temperature, and comments.
Screen #4 is the program selection screen. It lists the
actual tests that can be run on the HP 11757B. Do
not select any test until you have run the calibration
for the Network analyzer/S-Parameter Test Set.
Network Analyzer/S-Parameter Test Set Calibration
Before the adjustments are run, the s-parameter test set
must be calibrated.
The s-parameter test set and network analyzer requires
one hour of warm-up prior to performing the calibration.
Procedure
1. Connect the equipment as shown in gure 1-9.
4
ENTER
.
or
4
5
4
ENTER
EXECUTE
4
ENTER
HP 11757B
. Wait
5
. Follow
5
or
5

Advertisement

Table of Contents
loading

Table of Contents