4. Technical data
Recommended operating pressure
Permitted operating pressure
WARNING!
Inlet thread:
Liquids:
Liquid temperature:
Ambient temperature:
For further data see separate data sheet.
5. Assembly, set-up and installation
5.1 Hazard warnings
!
If any debris get into the sprinkler, it is possible that the sprinkler could be damaged or
destroyed. Flush out the line thoroughly before connecting the sprinkler to the water supply.
!
5.2 Installation instructions
•
The inlet thread connection on the TS120 pop-up sprinkler is 1½" NPT.
•
For the thread seal, use a sealing compound and/or material (e.g., Teflon tape). Please be sure your
sealing compound of choice is compatible with all materials at the point of connection.
•
The pop-up sprinkler should be installed in accordance with the TS120 sprinkler installation diagram
(see next page). In order to avoid any load pressure on the main line, use a recommended Toro
adjustable swing joint or other pressure compatible flexible connection.
•
Providing a drainage pit directly connected to the drainage, as shown in the installation diagram, is
strongly recommended.
•
For screwing in the connection joint, the housing or housing edge of the pop-up sprinkler can be
firmly held or clamped.
6
75 to 120 psi
45 to 145 psi
Inlet pressure at the sprinkler must never exceed 145 psi.
1½" NPT
Water only
104° F max.
140° F max.
Any unexpected incidents at start-up can lead to serious injury from the jet of
water. Make sure the installation has been completed before turning on the
water supply.