Do not attempt to move the laminator across
anything other than a flat, level surface
without trained and qualified riggers. You can
be crushed or seriously injured.
The ORCA-I Laminator is a large and heavy
piece of equipment. It is necessary to employ
LICENSED RIGGERS ONLY to move the
machine. The laminator is not designed to be
tipped up or sideways in any way. Such action
disturbs the exact alignment of the rolling
parts of the machine and requires extensive
realignment. GBC Pro-Tech's warranty does
not cover malfunction of the equipment due to
mishandling and/or tipping.
GBC Pro-Tech bears no responsibility for
personal injury or damage due to moving the
laminator improperly.
5. Remove any plastic strapping and packing paper
taped to the
s.
roll
Do not use a knife or other sharp instrument
during installation or while servicing the
laminator. You can cause irreparable damage
to the rolls.
6. Remove all packing materials to a safe distance
from the laminator.
⇒ A NOTE ABOUT RECYCLING
The crate components can be reused for shipping
the machine again, or can be disassembled and the
wood and screws recycled. The shrink wrap is not
recyclable, however, so it must be discarded.
⇒ NOTE
A word about international shipments: As these are
heavy pieces of equipment, GBC Pro-Tech takes
every precaution to ensure that our laminators are
properly crated to the highest standards.
© GBC Pro-Tech 1997 October
WARNING
CAUTION
EDNord - Istedgade 37A - 9000 Aalborg - telefon 96333500
Before machines leave our loading dock, they are
pre-treated with a VCI protective film to provide
total corrosion protection. This protective film is
wrapped around the machine and completely sealed.
In addition, moisture absorbing silicone desiccite
packs are packed inside the crate and machine
cabinets.
Prior to start up of the machine, you must remove
the desiccite packs from each cabinet and discard.
DO NOT operate the machine with the desiccite
packs inside the cabinets.
6HWXS
Once the ORCA-I Laminator has been unpacked and
moved into final position check each of the following
items.
Tools required:
1
/
" hex wrench
8
Adjustable wrench
Setup Procedure
1. Inspect the laminator for any obvious shipping
damage.
2. Remove the drive and control side cabinet covers
1
with the
/
" hex wrench by removing the upper
8
six screws holding each cover in place and then
loosening, but not removing, the lower two
screws and lifting each panel off the lower
screws.
3. Inspect all the bolts and tighten any that were
loosened during shipping.
4. Have a certified electrician wire the laminator
directly to a power source.
5. Set the nip. (See Section 4: Maintenance and
Troubleshooting for the procedure.)
6. Verify that the infrared sensors are not blocked.
Installation