Completing The Installation; Connecting Up And Purging The Circuit - Samsung MH040FXEA2A Installation Manual

Free joint multi & multi-split type room air conditioner
Hide thumbs Also See for MH040FXEA2A:
Table of Contents

Advertisement

Connecting Up and Purging the Circuit

C A U T I O N
The air in the indoor unit and in the pipe must be purged. If air remains in the
refrigeration pipes, it will affect the compressor, reduce to cooling/heating capacity and
could lead to a malfuction. Refrigerant for air purging is not charged in the outdoor unit.
Use Vacuum Pump as shown at the right figure. Each unit must be purged in turn.
 MH040FXEA2A / MH052FXEA2A / MH18VV1X/MH19VV1X
1
Check the piping connections.
2
Connect the charging hose of low pressure side of manifold gauge to the
packed valve having a service port (MH040FXEA2A:3/8" service valve 2EA;
MH052FXEA2A:3/8" service valve 1EA+1/2" service valve 1EA) as shown at the
figure.
3
Open the valve of the low pressure side of manifold gauge counter-clockwise.
4
Purge the air from the system using vacuum pump for about 10 minutes.
- Close the valve of the low pressure side of manifold gauge clockwise.
- Make sure that pressure gauge show -0.1MPa(-76cmHg) after about 10
minutes.
This procedure is very important in order to avoid gas leak.
- Turn off the vacuum pump
- Remove the hose of the low pressure side of manifold gauge.
5
Set valve cork of both liquid side and gas side of packed valve to the open
position.
6
Mount the valve stem nuts and the service port cap to the valve,
and tighten them at the torque of 183kgf•cm with a torque wrench.
7
Check for gas leakage.
- At this time, especially check for gas leakage from the 3-way valve's stem
nuts, and from the service port cap..
 MH060FXEA3A
1
Check the piping connections.
2
Connect the charging hose of low pressure side of manifold gauge to the
packed valve having a service port ( 3/8" service valve 2EA 1/2" service valve
1EA, at first connect A-unit & B-unit. After do 3~4, connect C-unit.) as shown at
the figure.
3
Open the valve of the low pressure side of manifold gauge counter-clockwise.
4
Purge the air from the system using vacuum pump for about 10 minutes.
- Close the valve of the low pressure side of manifold gauge clockwise.
- Make sure that pressure gauge show -0.1MPa(-76cmHg) after about 10
minutes.
This procedure is very important in order to avoid gas leak.
- Turn off the vacuum pump
- Remove the hose of the low pressure side of manifold gauge.
5
Set valve cork of both liquid side and gas side of packed valve to the open
position.
6
Mount the valve stem nuts and the service port cap to the valve,
and tighten them at the torque of 183kgf•cm with a torque wrench.
7
Check for gas leakage.
- At this time, especially check for gas leakage from the 3-way valve's stem
nuts, and from the service port cap.

COMPLETING THE INSTALLATION

Indoor
A-unit
Indoor
B-unit
Vacuum
Pump
Valve stem
Stem cap
Service port
Indoor
A-unit
Indoor
B-unit
Indoor
C-unit
Vacuum
Pump
Valve stem
Stem cap
Service port
21
E-

Advertisement

Table of Contents
loading

Table of Contents