Uv Vessel Installation - Pentair BIOSHIELD Installation And User Manual

Commercial uv sterilizer
Hide thumbs Also See for BIOSHIELD:
Table of Contents

Advertisement

8
SECTION 3: INSTALLATION

UV Vessel Installation

Purpose
Proper installation of the UV Vessel achieves expected
results and ensures safe operation.
Frequency
Required
with
new
replacement of outdated equipment.
Parts and Required Equipment
• Socket Wrenches
• Adjustable Wrenches
• Set of Slotted and Phillips Head Screwdrivers
• Lifting Equipment with Slings
• Vessel Mounting Brackets
• Required Isolation Valves
• Plumbing Components
• Personal Safety Equipment
General risk due to load.
General risk due to pressurized piping or UV
Vessel.
Quartz Sleeves are fragile and potentially
dangerous if broken. Handle with care.
Procedure
IMPORTANT: The installation of the UV system must
be carried out in accordance with local
regulations and codes.
1. Install the UV system after the mechanical filtration.
This eliminates debris from entering the vessel and
diminishing the unit's effectiveness, as well as
potentially damaging the quartz sleeves and UV
lamps.
2. Install inlet and outlet isolation valves (to be
supplied by others).
BIOSHIELD
Commercial UV Sterilizer Installation and User's Guide
®
construction,
retro-fit
3. Install UV vessel mounting brackets if required (to
be supplied by others).
NOTE: A 46" clearance for both Vertical Series and
CLP4 Series models is required for lamp and
quartz sleeve removal.
A 76" clearance for CLP6 Series models is
required for lamp and quartz sleeve removal.
or
Horizontal Installation
Horizontal installation requires the vessel outlet port
to face upwards, allowing trapped air to escape. If
installed on a "by-pass filter loop" or isolated using
valves, an automatic air bleed system is required.
Failure to remove trapped air can result in rupture
or heat damage to the vessel.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents