Commissioning; Making The Plant Ready For Operation - Kessel InnoClean PLUS EW 4 Installation, Operating And Maintenance Instrutions

Septic-system for installation in the ground in nominal sizes ew 4 to ew 50
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 91
Instruction / hand-over
The chapter "Safety instructions" must be heeded! (p. 2)
Commissioning is carried out by a specialised firm or by an
authorised KESSEL agent (at an additional charge).
The following persons should be present for the hand-over:
- Person authorised to perform the acceptance on behalf of
the building owner
- Specialised firm
In addition, we recommend the participation of operating per-
sonnel/operator, waste disposal contractor
Overview instruction:

5. 1. Making the plant ready for operation

5. 2. Checking the plant
5. 3. Instruction based on the installation and operating in-
structions
5. 4. Drawing up the handover certificate. (see chapter 13)
Once the instruction is completed, the plant must be made
ready for operation.
5.1 Making the plant ready for operation
Prior to commissioning, the plant must be completely cleaned
(including inlets and drains); solids and coarse particles must
be removed.

5. Commissioning

Both chambers of the plant must be filled UP with clear water
(see page 110).
Display/indicator panel
Movement keys/direction keys for guidance
through the program menu
Enter key/OK key
Back key/ESC key
Pilot lamp indicating readiness for operation
Pilot lamp for malfunction message
Power supply cable for control unit
Mains connection compressor
Connection compressed air sensor (optiional
accessoires)
Connection options for external signal
generator
Connection for valve block
Connecting socket for floating contact
0.
Syst em st ar t
System start
Sy s t em di agnos e
System diagnostic
0. 1
0. 2
0. 3
System information
1. 5
Syst em i nf o
Time:
20:45
Uhr z ei t :
20: 45
Floater: S1
Sc hwi m m er :
S1
S2
Events
Main power failure
Er e i gni s s e :
Ne t z a us f a l l
Normal phase
Nor m al phase
114
Language
Spr ache
deut s c h
f r anz ös i s ch
German
engl i s c h
French
English
Date/Time
Dat um / Uhr z ei t
Dat um
Date
01. 01. 2009 Uhr z ei t
01.01.02009 Time
12: 00
12:00
Classes
Kl assen
C
D
Nominal Size
0. 4
Nenngr ößen
EW 4
EW 6
EW 8
EW 10
...
EW 24

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents