Installation; Navigation - flowair T-box User Manual

Hide thumbs Also See for T-box:
Table of Contents

Advertisement

Available languages

Available languages

Installation

T-box controller has a built-in sensor for measuring air
temperature in the room. To ensure proper measure-
ments, the controller should be installed at a height of
approx. 1.5 m above the ground in a place with good air
circulation. Do not place it near heat sources, lighting, air
inlets, windows and door openings, etc.
T-box can be equipped with extra temperature sensor
(s), user shall to choose leading sensor (see page 55),
controller can be installed outside the heated room, e.g.
in maintenance room, technical room. Max distance is
50m.
1
2
www. owair.com
3
SW1
RESET
SW1
T-box
BMS
B A
B A
GND
VCC
max. 50 m
In the case, when T-box in BMS network is the last device,
SW1 switch should be set in T120 position.

Navigation

return to previous screen with
save of changes
return to previous screen without
save of changes
menu navigation
change of parameter value
change of unit group
DRV
T- box
GND
45

Advertisement

Chapters

Table of Contents
loading

Table of Contents