Verifying The San Volume Controller 2145-8F2 Or The San Volume Controller 2145-8F4 Installation; Connectors At The Back Of The San Volume Controller 2145-8F4; Connectors At The Back Of The San Volume Controller 2145-8F2 - IBM 2145-8F2 Hardware Installation Manual

System storage san volume controller
Hide thumbs Also See for 2145-8F2:
Table of Contents

Advertisement

2. Connect the other end of the Ethernet cable to the proper connector on the
Figure 47. Connectors at the back of the SAN Volume Controller 2145-8F4
Figure 48. Connectors at the back of the SAN Volume Controller 2145-8F2
3. Connect the fibre-channel cables to the fibre-channel ports as required by the
4. Connect the other ends of the fibre-channel cables to the proper connectors of
Verifying the SAN Volume Controller 2145-8F2 or the SAN Volume
Controller 2145-8F4 installation
You must verify the SAN Volume Controller installation after the installation has
completed.
50
IBM System Storage SAN Volume Controller: Models 2145-8F2 and 2145-8F4 Hardware Installation Guide
Attention: You must use only Ethernet port 1 on the SAN Volume Controller.
The software is configured only for Ethernet port 1.
Ethernet hub or switch.
5
1
Fibre-channel port 1
2
Fibre-channel port 2
3
Fibre-channel port 3
4
Fibre-channel port 4
5
Ethernet port 1
1
2
1
Ethernet port 1
2
Low-profile, dual-port fibre-channel host bus adapter (HBA) with ports
1 and 2 (left to right)
3
Full-height, dual-port fibre-channel HBA with ports 3 and 4 (left to
right)
Attention:
When routing the fibre-channel cables, do not tighten the cable
straps or bend the cables to a radius smaller than 76 mm (3 in.).
user's configuration.
the fibre-channel switches.
1
2
3
4
3

Advertisement

Table of Contents
loading

This manual is also suitable for:

2145-8f4

Table of Contents